Download Print this page

Pat Testing; General Safety Requirements - Prem-I-Air EHO154 Quick Start Manual

2kw 2-position fan heater

Advertisement

For the cooling function, turn the control knob to cool (3) and the thermostat anti-
clockwise.
AUTO SAFETY SHUT OFF
The heater has a built-in safety device, which will switch the heater OFF in case of
accidental overheating.
To reset the heater, follow the next steps:
e
Turn the control setting to the 'O' (2) position.
e
Unplug the heater from the mains and let the heater cool down, approx. 5
— 10 minutes.
e
Once the heater is cool you are now able to plug in and operate as normal
as per the above instructions to the desired heat setting.
e
Once the desired temperature has been reached, turn the thermostat (1)
anti-clockwise towards the minimal setting until the heater switches off.
The thermostat switch will keep the room temperature at the desired
temperature automatically.
e
You can also turn the thermostat switch anti-clockwise to the minimum
position or turn the thermostat switch clockwise to the maximum position
to make the temperature lower or higher.
NOTE: The heater does remain hot / warm for some time after the unit has
been switched off, please handle with care.
PAT TESTING
When
used in a workplace, this product should be safety-tested yearly by a
qualified electrician (PAT Tested). We recommend that it is PAT tested regularly
when used in a domestic environment.
GENERAL SAFETY REQUIREMENTS
Domestic wiring must be tested periodically by a qualified electrician at least once
every 10 years or at every change of occupancy.
For office and retail premises, and buildings such as village halls, the wiring must
be inspected at least once every 5 years.
It is recommended that all buildings be fitted with smoke alarms (it is mandatory for
new buildings).
2580
Ver. 3 - 09/18

Advertisement

loading