Download Print this page

ABB Inline II ZLBM123 Installation Instructions page 2

Advertisement

1A
Cable terminals from top.
6mm-20Nm
L3
L1
1B
Cable terminals
from top
M12-25Nm
2
V-clamp connection
6mm-25Nm
Rm
Re
25-50
25-50
35-50
70-185 70-240 70-240 95-300
Note!
Pressure pad can be turned.
Copyright 2023 ABB. All rights reserved.
www.abb.com
L2
High version
Low version
ZHBM
ZLBM
Sm
Se
35
35-70
Cu/AI
Use thumbs to widen the side
walls and lift up the plastic cover.
Turn the z-clamp and the plastic
cover 180 degrees.
Close 90
Close 90
M12-25Nm
*Cable lug must be tin-coated.
Kabelschuh muss verzinnt sein.
电缆接头必须镀锡。
IMPORTANT :
When mounting terminal kits, review dedicated
installation instruction!
Al-conductors have to be brushed and greased before connection.
Al-Leiter müssen vor dem Anschluss gebürstet und gefettet werden.
铝导体在接线前必须去除氧化层并涂油。
Z-Busbar system
Z-clamp should be attached
to Z-Busbar correctly.
185mm-Busbar system
1 Pole
3 Pole
Standard connection
DIN 46235(Cu)
DIN 46329 (AI)*
Guide marks

Advertisement

loading

This manual is also suitable for:

Inline ii zhbm123