• 1-phase and 3-phase homes RedEarth’s BushChook systems offer Australian-made scalability, making them an excellent and enduring investment for your home. Available in both single and three-phase configurations, the BushChook provides a range of power outputs tailored to accommodate your specific needs...
Page 2
AS/NZS 5139:2019 Electrical installations-Safety of battery systems for use with power conversion equipment The BushChook must only be installed by suitably qualified personnel who have read and are familiar with its operation and hazards. The battery provided with this system must only be charged by the Deye inverter or the V2G (vehicle to grid) charger supplied by RedEarth.
Main Switchboard wiring & Feed-in Meter Installation ....................20 Battery connection ..................................23 Earth Fault Alarm ....................................24 Solar connection ....................................24 Connecting the BushChook in an Off-Grid Installation ....................25 Step 5. Understanding the Turn ON/SHUTDOWN Procedure ....................26 Step 6: Commissioning the system ..............................
There are models for both single-phase (8kW & 5kW) and three-phase (12kW) homes. BushChook is an all-in-one battery system designed to be very easy to install. As an Australian- made product built in Brisbane, RedEarth provides best-in-class support for BushChook owners and installers.
Page 5
RedEarth offers its PPP to generate more value for BushChook battery system owners than is generally available from other battery systems which do not offer an ongoing support program like RedEarth's Optimum. Contact RedEarth for more details.
125kg complete without batteries. AS/NZS 5139. Note: if the system is >300mm off the • 1040H x 1180W x 580D [mm] wall then this does not apply. The BushChook system should be installed in a shaded area. Single-Phase 5KW system Single-Phase 8KW system...
In addition to the Feed-in meter the MSB will also require a MCB to be installed to allow the BushChook system to be isolated, for example to work on the MSB. 3. Load: AC cables from the MSB directly to the Load terminals inside the BushChook system.
Page 8
PV inverter OR it can power a "smart load" such as a pool heater or crypto miner. See notes below. By Default, the SMART port is configured to operate a Backup Generator, please notify RedEarth at the time of sale, or installation if you wish to adjust this .
Page 9
1. Book the install with RedEarth: When you know the installation date, book the time with RedEarth so that they are sure to be there to help you and also confirm that the system and the remote monitoring is properly setup.
Inside Layout The BushChook is divided into three main areas. On the Lefthand side (LHS) are the batteries, in the middle Is the Inverter and on the Righthand Side (RHS) are the electrical components and cable connection points for installation.
This area Is designed for easy access to all the switchgear and wiring, like a typical switchboard. To access this panel to right-side cover of the BushChook system is removed. Here you will find all the protection devices and the connection points needed to wire in the system during installation.
BushChook – Installation and Operation Manual Parts kit and documentation: The BushChook is supplied with documentation and a parts kit box to complete the installation. Documentation BushChook installation manual BushChook user manual BushChook identification sheet (serial #s etc) Feed-in meter manual (Eastron) Inverter manual –...
filled with 8 lithium batteries. The BushChook 12kW 3-phase weighs 465kg when filled with 8 Troppo batteries. The image shows a BushChook with batteries packed separately as well as a second pallet of solar panels in a trailer. WARNING: Personal Injury Use safe lifting techniques and standard safety equipment when transporting and installing the BushChook system.
60degC at which point It will shut down. (Once the system cools down again it will restart automatically). The BushChook system should be located at least 100mm off the wall to allow for proper ventilation through the rear vents. If possible, it should be placed closer to the solar panels and the main switchboard to minimise cable run length and voltage drop/power loss.
% / °C +0.040 BushChook 8kW 1-phase system: A maximum of 12kW of PV can be connected to the x2 MPPTs. Each MPPT can have two strings connected in parallel as shown in the table below. These parallel strings must be the same length and be oriented in the same direction.
Page 16
No. of MPPT trackers No. of strings per MPPT tracker BushChook 12kW 3-phase system: A maximum of 18kW of PV can be connected to the x2 MPPTs, however this is configured with one string going to the first MPPT and two equal length and parallel strings going to the second MPPT.
The PV isolation is provided by built-in MCBs. The number of MCBs depends on the size of the BushChook system. 5kW (2 strings and 2 MCBs), 8kW (4 strings and 4 MCBs) or 12kW (3 strings and 3 MCBs). See image at right for the 12kW 3-phase system.
MEN link and an earth stake. To begin, remove the lid of the unit as explained in “Opening the BushChook” section. Next remove the right-side panel. This will provide direct access to all the switchgear and all the connection points needed for installation.
Page 19
MCB labelled SMART Port. This opens the opportunity to redirect the output of an existing PV system to this port, allowing it to be controlled by the BushChook system. Note: It is important that the shutoff frequencies are set appropriately so that the BushChook system can correctly...
4.2.1 Whole home backup (requires sufficient inverter size) If the whole home is being backed up by the BushChook (all circuits - like what happens in an off-grid installation) then there is no need to separate the circuits in the switchboard. Also, the CT built into the BushChook inverter is used and there is no need for an external CT/Feed-in meter to be installed.
Page 21
2 wires of a CAT5 or CAT6 cable. Connect one strand to the terminal A on the Eastron meter and the second to terminal B. See the image below. Inside the BushChook the terminals that the other end of this CAT cable will connect to are located on the end of the AC DIN rail. Strip the end of strands A and B and connect them to the correct terminals.
Page 22
BushChook – Installation and Operation Manual then the CT is not required as the CT built into the BushChook inverter is used instead. Also, this meter is also not required in an off-grid installation. • Optional SMART Port MCB - if used. Note, any existing PV Inverter can be connected to the Smart port of the BushChook to allow greater control of its operation and also to keep it operational during any grid outage.
48Vdc nominal. Procedure to install batteries: 1. Ensure the MAIN BATTERY BREAKER on the right side of the BushChook is turned OFF. (MCCB breaker) 2. Take the batteries out of the transport boxes and place them next to the BushChook system.
To connect the solar arrays, run the pairs of unterminated PV cables into the lower set of 25mm holes in the rear of the BushChook (The glands provided in the parts kit are designed to seal Page 24 of 48...
It is located on the left side of the inverter below the ON/OFF button, as shown here. Connecting the BushChook in an Off-Grid Installation When connecting the BushChook in an off-grid installation, the same process as above is followed, however there is no grid to connect to or feed-in meter to install.
BushChook – Installation and Operation Manual Step 5. Understanding the Turn ON/SHUTDOWN Procedure Before starting up the BushChook confirm the following items have been completed: • The PV cables have the correct polarity and are correctly connected to the MCBs provided, particularly any parallel strings going into the same MPPT.
The BushChook is commissioned and tested in RedEarth’s factory to confirm correct operation of the system prior to shipment. The RedEarth settings can be accessed via the Local-mode login on the Solarman APP that can be downloaded from the app stores.
These can be reviewed to confirm the settings are suitable for the Installation site, including Australia A, B or C (for grid-connected systems) Note: Max solar power setting depends on BushChook model/PV actually Installed Page 28 of 48 Issue date: 19/12/2023. Version 1.1...
Page 29
BushChook – Installation and Operation Manual Page 29 of 48 Issue date: 19/12/2023. Version 1.1...
Page 30
BushChook – Installation and Operation Manual Adjusting Generator Charge Rate This is usually only required if the BushChook is installed off-grid. To adjust the generator limit you must adjust two parameters. 1. Adjust the Power in section "Time 1", this will adjust how much the generator can be used to feed any loads if the battery is full.
Page 31
BushChook – Installation and Operation Manual SMART PORT SETUP The generator input port (SMART Port) can be reconfigured as either a smart load output port or as an AC-coupled renewable energy input port. Smart Load Output (e.g., to connect an air-conditioner) To convert the generator port to a smart load output (disabling generator functionality), navigate to the smart load setting panel and adjust the smart load setup dropdown to read "Smart Load...
Enabling this setting allows you to adjust the level of export to the grid when the batteries are full because of charging from the renewable AC Source. NOTE : Changes to the BushChook settings must be done by a trained/qualified person. If in doubt, contact RedEarth Support...
Page 33
BushChook – Installation and Operation Manual When in parallel mode, check the parallel communication cable connection and hybrid inverter communication address setting; Parallel CANBus fault During the parallel system startup period, inverters will report F29. when all inverters are in ON status, it will disappear automatically;...
Backup mode. (e.g., fridge & home Wi-Fi) 6.5.1 Normal operation In this operation mode the BushChook will use solar, battery and grid, depending on the situation. All of the breakers and isolators should be in the ON position and the Bypass switch should be in the up position ( I ).
RedEarth EMU app. It also registers their warranty. 2. Confirm that the customer has downloaded the RedEarth EMU APP and is logged-in, otherwise provide the customer’s contact details to RedEarth to complete onboarding the customer at a later time.
Page 36
4. Also demonstrate the operation and effect of the By-pass switch, which isolates the battery from the customers home. 5. Show the customer the isolation switches for the BushChook which you have installed in their Switchboard. 6. Obtain any customer signatures required for claiming STC’s 7.
Additional Troppo batteries - up to a maximum of eight for the BushChook (32.8kWh nominal) • V2G – Vehicle to Grid - from your EV to your BushChook system to the grid (EV requires a GPO) • Remote display for your kitchen bench top (in development)
To reach our customer service and tech support team, you can contact: • RedEarth office: Dial 1800 733 637 and press Option 2. If our support team are currently engaged in other calls or on-site visits, kindly leave a short message to ensure a prompt call back.
BushChook – Installation and Operation Manual Appendix A Single Line Diagram—Power (1-phase and 3-phase versions) Page 39 of 48 Issue date: 19/12/2023. Version 1.1...
Page 40
BushChook – Installation and Operation Manual Page 40 of 48 Issue date: 19/12/2023. Version 1.1...
BushChook – Installation and Operation Manual Single Line Diagram—Communications (1-phase and 3-phase are the same) Page 41 of 48 Issue date: 19/12/2023. Version 1.1...
BushChook – Installation and Operation Manual Single Line Diagram—Main Switchboard (1-phase and 3-phase versions) Page 42 of 48 Issue date: 19/12/2023. Version 1.1...
Page 43
BushChook – Installation and Operation Manual Page 43 of 48 Issue date: 19/12/2023. Version 1.1...
Protection degree of BushChook system IP43 RedEarth Warranty 10 years (AU & NZ and South Pacific region) * The BushChook system is designed to only use the RedEarth Troppo-4841 lithium-ion battery (LFP). Page 44 of 48 Issue date: 19/12/2023. Version 1.1...
BushChook – Installation and Operation Manual ** The Nominal Energy Capacity depends on the number of Troppo-4841 batteries installed in the BushChook system. The model numbers reflect the total battery capacity installed in the system. Troppo-4841 battery specifications The table below includes all the specifications of the Troppo battery that need to be understood.
Page 46
Physical characteristics Installer information Battery mounting options RedEarth can provide pre-wired VAULT battery racks. RedEarth also has a In a standard 19” rack or free-standing range of certified fully pre-wired inverter battery systems for both on- and horizontally, vertically or on either side off-grid applications.
Page 47
BushChook – Installation and Operation Manual Discharge over-current protection (2 levels) Two over-current protection levels: 250+/-60A delay 20-400mSec 250±60A(20-400mS) & 400±100A(10- 400+/-100A delay 10-100mSec 100mS) Inverter capacitors -starting capability A single TROPPO battery can provide the surge current needed to start an 14,600uF inverter with up to 14,600uF of capacitors on the DC side.
Page 48
BushChook – Installation and Operation Manual Page 48 of 48 Issue date: 19/12/2023. Version 1.1...
Need help?