Download Print this page

Tadiran Telecom MINI-VRF Installation Manual page 3

Dc variable frequency outdoor unit

Advertisement

This
air conditioner
is
a
comfortable unit. Dontt
use
it in
some
special
places
for
machine rooms, precise
instruments,
foods,
plants, animals,
artworks.
etc,
The
installation
shall be
done
by
the
distributor
or
the
professional
staff. The installation staff must
have related professional
knowledge.
Misoperation
in
the
self-installation
will
result
in fire,
electric shock,
injury,
water leak, etc.
Ifthe
air conditioner
is
installed in
a small
room,
some
proper
measures shall be taken
to
make sure that the concentration
ofrefrigerant
leak
in
the
room shall not exceed the
critical
level. For detailed
meaiuis,
please consult the
distributor.
When
connecting the
power supply' comply with
the regulations specified
by
the local
power
company.
According
to the law, the ground
wire
must
be
connected. The misconnection
ofthe
ground
wire
will
result
in
electric shock.
If
the
at
conditioner
needs
to
be moved
or reinstalled,
please
inform
the
distributor or
the
professional stafi to
operate.
Inconect installation
will
result
in fire,
electric shock,
injury,
water leak,
etc.
The
users
axe
not
permitted
to
rebuild
or repair the
air conditioner by their
om.
Incorrect repair
will
result in fire, electric
shock,
injury,
water leak,
etc.. Please
inform
*re
distributor
or
the
professional
staffto
repair.
Make
sure
the water drainage
ditch
is useable.
Make.sure a
current
leakage
protection switch is
equipped.
The current
leakage
protection switch
must be equipped.
Ifnot,
an
electric
shock
will
take
place.
It mush't
be
installed in
any
potential
leakage
location ofinflammable
gas.
In
case
ofthe
inflammable
gas
leak around the outdoor
unit,
a
lire
takes
place.
Make
sure
the foundation and
hoisting
are
fim
and
reliable.
Ifnot,
it
will
result
in
a
falling
accident.
Make
sure
all
cables are
correctly
connected. The misconnection
ofthe
cables
will
result
in
the damage
ofelectrical
components.
Pre-instrallation exposure
to water or
other moistures
will
result
in
short circuit
ofits
electrical
components..
Don't
store
it
in
any damp
cellar or
expose it to rain or water.
In
caseofthe
refrigerant
leaks
during installation,
the
room
must
be ventilated
at once.
Ifthe
leaked
refrigerant is
exposed
to
flame,
some
toxic
gases
will
be
generated.
After installation,
make
sure
the refrigerant
is
not leaked.
Ifthe
refrigerant
gas
in
the
room
is
exposed
to flame source, such
as
a
heatet
a
stove or an
electric
cooker,
some
toxic
gases
will
be
generated..
A
lightning protection
device must
be
equipped according to
national
laws
and
regulations against the
lightning
strike.
Points
for
Construction fns
2.1
Anival
ofgoods
and open-case
inspection
i)
when
receiving
lhe
machine, check
if
there
is
any
damage
in
trmsportation.
If
any
surface
or
intemal
dmage
is
ibund,
please
infom
the
trarsportation
agency
in
a
witten fom.
'
2)
Afru
receivittg the machine,
check
if
the
type, specification
and,
qumtity
of
the machine
confom
to the contract.
3)
when
unpacking the product,
please keep
tlre Manual
well
and check
all
accessories.
2.2
Refrigerant pipe
l)
The-refrigerant pipe must be installed by the special
refrigerant dishibutor
made by our company (purchase).
2)
The refrigerant pipe must
use
the pipe
with
specified diameter
and
wall
thickness.
3)
The
welding of
the copper
pipe
must
be
performed
with nihogen-filled protection. Before welding,
the copper
pipe
must be
filled with
the
nitrogen
of
0.2kgflcnt'. After welding,
the nitrogen must
be
cut
offuntil
G
copper pipe
is
thoroughly
cooled down.
4)
The refrigerant pipe must be treatcd
with
themal
insulation.
5)
After
the refrigerant pipe is installed
and
before the air tightness test and vacuumization
are
performed, the
indoor
uit
cannot
be
power-on.
2.3
Air
tightness test
After
the
refrigerant pipe
is
instalied,
nitrogen
of40kgf/crf 1+.oula;
must be
filled
from
the gas side and
liquid
side
simultaneously for
24-hour
air
tightness
test.
2.4
Vacuumizing
After
the air tightness test, vacuumization
(0.lMPa)
must be
perfomed from
both thc
gas
side and the
liquid
side simultaneously.
2.5 Refilling
of refrigerant
l)
The
refilling volune of
refrigerant is
calculated
by
the diarneter and
length (actual length)
of
the pipe
at the
liquid
sides
of
the
indoor
and
outdoor
unlts.
2)
The
refilling
volume of
refiigermt,
diameter and length
(actual length) of
liquid
pipe,
and
height difference
of
the
indoor
and outdoor
units
shall be
recorded
into
the
me confirmation
table of the outdoor
unit
(on the cover plate
of electronic
conlol
box) for
future reference.
2.6
Electrical
wiring
1)
The
power
sryply
capacity
and
wire
diameter
shall be
selected
according
to
the
design
manual. Generally,
the
power
line
ofthe
air
conditioner
is
thicker
thm
rbat
of
rhe
motor.
2)
To
prer'mt miscperatim
of
the
airsnditioner,
don't interlace or wind
the
power line
(220-240v-l3g0v
3N-)
wi*r
the connecting
wires (low-voltage
nires)
of
rhe
indmr
and
mrdoor
mis.
i
t
Tb€ iDdoor
mir
b
pora-c
affa
air
tighbss
test
md
vacumization.
'- Trtdnr
I
t ti{ rr '-l
bc
pafucd
-n
6e
orlldor
uit
is
pos'r-on
for
more rhan
12
hours, or the system may be damaged.

Advertisement

loading