Dimensional Drawings - Bindicator Bin-Flo L Series Installation & Operation Manual

Table of Contents

Advertisement

V-BOTTOM BIN
This arrangement may be used in bins emptied by screw conveyor, belt conveyor or other means where the
discharge opening runs the entire length of the bin. It provides full and uniform fl ow to the discharge opening
without bridging over the outlet. Number of rows of Bin-Flo aerators required and spacing will depend upon the
size of the bin as well as the material being handled.
INSTALLATION IN
FLAT BOTTOM
V. DIMENSIONAL DRAWINGS
L Series
A
3
/
" (95.25 mm)
3
4
B
7
/
" (190.5 mm)
1
2
C
/
" (11.09 mm)
7
16
/
" Pipe x 2" Long
1
8
D
OD = 0.405
(10.29mm x 50.8mm)
Bin Wall
Air Baffle
Non-clogging air
diffuser fabric:
Cotton or Fiberglass
Shown with
/
" hole in wall
1
2
of bin or bottom of chute for
internal mounting
Bin-Flo Aerators
Pipe manifold of
adequate size
LL Series
6" (152.39 mm)
12" (304.8 mm)
/
" (17.46 mm)
11
16
/
" Pipe x 2" Long
1
4
OD = 0.540
(13.72mm x 50.8mm)
Lock
Nipple
Nut
Air Pressure
Equalizing
Galvanized steel or 316 SS
Chamber
mesh framework above and
below diffuser fabric.
Stainless or zinc
plated steel body
A
C
C
7
www.bindicator.com
Bin-Flo Aerators
Air Supply
B
D

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bin-flo ll series

Table of Contents