COMMISSIONING THE SYSTEM
ATTENTION
• Make adjustments after electrical safety inspection.
• Once the power is switched on, test the heat pump to check its
performance.
PREPARATION BEFORE ADJUSTMENT
• The system is installed correctly.
• Pipes and lines are installed correctly.
• Accessories are installed correctly.
• Ensure clear drainage from overflow pipe.
• Ensure adequate insulation on pipework.
• The supply voltage meets requirements.
• Air inlet and outlet are functioning properly.
• Electrical leakage protector is functioning properly.
28
ADJUSTMENT PROCESS
• Check if the switch on isolator is functioning properly.
• Check if the buttons on the control panel are functioning properly.
• Check if the indicator light on the PCB is lit up.
• Check if the drainage system is functioning properly.
• Check if the system is heating correctly after start up.
• Check if the water outlet temperature is acceptable.
• Check if there is excessive sound when the system is functioning.
• Check if there is refrigerant leakage.
• If any fault occurs, please check the instructions first, to analyse
and remove the fault.