Delta 5CN-550L Instructions Manual page 5

Steam bath digital interface
Table of Contents

Advertisement

Available languages

Available languages

Figure 3
Adhesive Liner
Figure 4 - Installation Directions
Steam head should be mounted
Steam head Installation
12" to 18" above the finished floor
Steam head should be mounted
or 6" above the rim of the tub and
12" to 18" above the finished floor
as far away from the bather and
or 6" above the rim of the tub and
interface as possible (opposite
as far away from the bather and
wall preferred).
interface as possible (opposite
wall preferred)."
Coupler
Interface Cable
Locate interface away from the
Locate interface away from the
direct line of shower spray and
direct line of steam spray and
do NOT locate above steam
do NOT locate above steam
head. Opposite wall from the
head. Opposite wall preferred.
steam head is preferred.
5
to Generator
114570 Rev. A

Advertisement

Table of Contents
loading

This manual is also suitable for:

5ch-550l5cb-550l

Table of Contents