Download Print this page

dehn BXT BAS EX Installation Instructions Manual

Advertisement

Quick Links

Blitzductor BXT BAS EX / BXT BAS WCO EX BXT M2 BD E EX 24 / BXT M2 BD S EX 24
DE Einbauanleitung
GB Installation instructions
IT Istruzioni di montaggio
FR Instructions de montage
NL Montagehandleiding
ES Instrucciones de montaje
PT Instruções de montagem
DK Monteringsvejledning
SE Monteringsanvisning
FI Asennusohje
GR Οδηγίε συναρ ολόγηση
PL Instrukcja montażu
CZ Montážní návod
TR Kurulum Talimatları
RU
CN 安装说明
HU Szerelési útmutató
JP 設置説明書
www.dehn.de
www.dehn-international.com
Connection / Anschluss
0.08 - 2.5 mm²
AWG 28 -14
7 mm
≤ 0.4
≤ 3.5
Nm
in-lbs
2.5
0.4
mm
mm
Accessories / Zubehör
Shield
SAK BXT LR
∅3 - 10
40
7
12
26
1.
Fasten shielding braid
into the clamp
2.
Abschirmgeflecht in der
Klemme fixieren
I
L
protected
protected
 ≥ 4 mm²
≤ AWG 10
indirect shield earthing /
**)
Indirekte Schirmerdung
7
*) direct shield earthing /
Direkte Schirmerdung
3.
4.
Basic circuit diagrams / Prinzipschaltbilder
1
1
2
2
3
1
4
1
2
3
4
shield earthing / Schirmerdung
terminal 4
*) direct shield earthing
Direkte Schirmerdung
BXT ML2 BD S EX 24
terminal 2
1719 / 01.22 / 3010795
*)
2
4
1 2 3 4
1
3
*)
*)
2
2
2
**)
4
4
4
1 2 3 4
4´ 3´ 2´ 1´
1
1
1
1
3
3
3
3
**)
**)
*)
2
4
1 2 3 4
1 2 3 4
1
3
*)
*)
2
2
2
**)
4
4
4
1 2 3 4
4´ 3´ 2´ 1´
1
1
1
1
3
3
3
3
**)
**)
terminal 3
**) indirect shield earthing
(only in case of BXT ML2 BD S EX 24)
Indirekte Erdung des Schirmleiters
(nur bei BXT ML2 BD S EX 24 möglich)
terminal 1
© COPYRIGHT 2022 DEHN SE protected by ISO 16016
*)
4´ 3´ 2´ 1´
*)
*)
**)
1 2 3 4
4´ 3´ 2´ 1´
**)
**)
**)
indirect shield earthing /
Indirekte Schirmerdung
*)
direct shield earthing /
Direkte Schirmerdung
*)
4´ 3´ 2´ 1´
4´ 3´ 2´ 1´
*)
*)
**)
1 2 3 4
4´ 3´ 2´ 1´
**)
**)
terminal 1
terminal 2
terminal 3
terminal 4

Advertisement

loading

Summary of Contents for dehn BXT BAS EX

  • Page 1 1719 / 01.22 / 3010795 Basic circuit diagrams / Prinzipschaltbilder Blitzductor BXT BAS EX / BXT BAS WCO EX BXT M2 BD E EX 24 / BXT M2 BD S EX 24 DE Einbauanleitung GB Installation instructions IT Istruzioni di montaggio FR Instructions de montage 2´...
  • Page 2 Ui = 33 V; li = 500 mA; Pi = any; Ci = 0nF; Li = 0 µH ***) The Blitzductor series BXT shall be installed into an enclosure, which meets the requirements of a recognized type of protection, in accordance with ANSI/ISA-60079-0 (2009) or CAN/CSA-C22.2 No. 60079-0-07. © COPYRIGHT 2022 DEHN SE protected by ISO 16016...
  • Page 3: Ec/Eu Declaration Of Conformity

    Produkt(e): Dr. Peter Zahlmann ppa. Dr. Ralph Brocke General Manager Director R & D CE_BXT_M2_BD_S_EX_24 23.04.2018 1 of 2 CE_BXT_M2_BD_S_EX_24 23.04.2018 2 of 2 © COPYRIGHT 2022 DEHN SE protected by ISO 16016...
  • Page 4 Produkt(e): Dr. Peter Zahlmann ppa. Dr. Ralph Brocke General Manager Director R & D CE_BXT_M2_BD_E_EX_24 23.04.2018 1 of 2 CE_BXT_M2_BD_E_EX_24 23.04.2018 2 of 2 © COPYRIGHT 2022 DEHN SE protected by ISO 16016...
  • Page 5 Zündschutzart Ex ia bestimmt sind. veilig geaard is (IEC 60079-14). In de stroomkring mogen enkel componenten worden gebruikt die bestemd zijn voor de beschermingsklasse Ex ia. © COPYRIGHT 2022 DEHN SE protected by ISO 16016...
  • Page 6: Instrukcje Bezpieczeństwa

    ーネン トのみを使用し て く ださい。 bevezetés helyén nincs biztonságosan, egy potenciálkiegyenlítő vezetéknek megfelelően, földelve (IEC 60079-14). Az áramkörben csak olyan alkatrészeket szabad használni, amelyek az Ex ia gyújtás elleni védettségnek megfelelnek. © COPYRIGHT 2022 DEHN SE protected by ISO 16016...

This manual is also suitable for:

Bxt bas wco exBxt m2 bd e ex 24Bxt m2 bd s ex 24