Nutrunner
1.
Press the menu button.
2.
Select the correct mode.
3.
Press the reverse button to select the right direction.
4.
Increase or decrease torque value by pressing left and right button respectively. Set the required torque.
5.
Place the socket on the nut, make sure that it is fully engage the nut.
6.
Make sure that reaction arm is firmly rested on adjacent nut.
7.
Press and keep pressure on second trigger.
8.
Press and keep pressure on principal trigger.
9.
Keep the triggers pressed till the end of the operation.
10. Check the operation status on reporting LEDs.
• Green - OK
• Red - Not OK
EN
© Chicago Pneumatic - 6159991160
Operation
11