Preparation; Prepare Top Unit For Stacking - SciQuip Incu-Shake Compact User Manual

Hide thumbs Also See for Incu-Shake Compact:
Table of Contents

Advertisement

1.

PREPARATION

TOOLS NEEDED:
Philip Screwdriver
2.

PREPARE TOP UNIT FOR STACKING

2.1 Remove the standard base off the top unit
Attention:
2.2 Unscrew the Philip screws on four cover plates on each side of the main unit.
2.3 Once the plates are removed, Use the M8 Allen key to unscrew the inner socket
head bolts connecting the main unit on the low base. Keep the inner socket head
bolts for use in Step 3.6.
M8 Allen Key
Each Incu-Shake Compact comes standard with a low base
H15cm. The 15cm standard base must be removed before the
unit can be stacked onto another existing unit.
.
Stacking Handle Bars (4 pcs, included with main unit)
2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Incu-Shake Compact and is the answer not in the manual?

Table of Contents