Premium compact stackable shaking incubator orbital model (49 pages)
Summary of Contents for SciQuip Incu-Shake Compact
Page 1
User’s Manual Stacking Kit This Manual applies to: Modes: Incu-Shake Compact...
Page 2
PREPARE TOP UNIT FOR STACKING 2.1 Remove the standard base off the top unit Attention: Each Incu-Shake Compact comes standard with a low base H15cm. The 15cm standard base must be removed before the unit can be stacked onto another existing unit.
Page 3
2.4 Remove the four plastic caps on both side walls and install the stacking bar handles. The stacking bar handles can be used when performing the stacking operation with manpower. Please be noted that each single unit weighs up to 150kg. 2.5 Then the main unit can be detached from the standard 15cm low base.
Page 4
WARNING: • Manual stacking can be dangerous! • Each Incu-Shake Compact weighs up to 150kg. • Mind your safety and take extra cautions when handling stacking manually with the bar handles. • Use mechanical assistance whenever possible, such as forklift or hydraulic lifter.
Page 5
STACKING AND MOUNTING 4.1 Using a forklift or manually lift to raise the bottom Incu-Shake Compact (without base) 4.2 With two assistants guiding the shaker from opposite sides, lower the unit onto the bottom unit, rear end first. 4.3 Manually adjust the position of the top unit, and make sure the holes of the top unit aligns with the mounting holes of top of the bottom unit.
Need help?
Do you have a question about the Incu-Shake Compact and is the answer not in the manual?
Questions and answers