Drop-In Installation - Jacuzzi SOAKER Sia SIA7242BCXXXXW Installation And Operation Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

Fuzion™ Frame Installation
If you are installing a Fuzion™ bathtub, please
refer to the Fuzion™ Frame Installation Guide
(#GL44000) before proceeding any further. Complete
the installation and assembly steps according to the
Fuzion™ Frame Installation Guide.

Drop-in Installation

Before you begin your installation, please read the following:
Observe all local and building codes.
Determine which tools will be used during the installation.
Additional bathtub drain parts and plumbing are commercially available at plumbing and hardware stores.
Drain/Overflow rough-in information is included with your bathtub in the Technical Specifications Manual
Complete the bathtub surround installation (Figure 7).
Install drain/overflow according to the
1
manufacturer's instructions. Refer also to the
Technical Specifications Manual.
Watertight installation of the drain is the installer's
responsibility. Drain leakage is excluded from the
Jacuzzi Luxury Bath warranty of this product.
Install the faucet at this time. It is recommended
2
that the faucet be installed by a qualified plumber.
Proper installation of the spout plumbing and
compliance with local codes are the responsibility of
the installer. Jacuzzi Luxury Bath does not warrant
connections of water supply fittings and piping,
fill systems, or drain/overflow systems. Nor is it
responsible for damage to the bathtub which may
occur during installation.
A non-flammable protective barrier must be placed
between the soldering work and the bathtub unit to
prevent damage to the bathtub.
Prepare the cut-out hole for the bathtub using
3
either the provided full scale template or the cutout
dimensions listed in the Technical Specifications
Manual.
The template may show guides for more than one
bathtub, be certain to select the appropriate guide
lines. If undermounting is an option, be careful to
select the guide lines that apply to the installation
that you are performing.
Complete all deck finish work and cover to protect
4
from damaging while placing the bathtub.
Insulation may be placed within the bathtub
5
surround.
Turn off the power supply to the GFCI protected
6
circuit.
Place a piece of scrap lumber on each of the ends
7
of the cutout – this will be used as a temporary
support prior to lowering the bathtub fully into the
opening (Figure 8).
Page 10
Fuzion™ Frame
Tile
Subfloor
Mortar or
Adhesive
Flashing
Figure 7 - Surround Installation
Tile or Finished
Surface
Scrap Lumber
Substrate
Support
Member
Figure 8 - Drop-In Installation
www.jacuzzi.com
Soaker™ Bath Series
Sealant
1˝ x 4˝
(25mm x 101mm)
Exploded View
Not For Support
Flat Subfloor
Installation and Operation
Scrap Lumber
Minimum 3˝
(76mm)
Clearance

Advertisement