3. UNIT INSTALLATION

3.1 Installation Instruction
This electrical water heater shall be installed on a solid wall. If the strength of the wall cannot
bear the load equal to two times of the total weight of the heater filled fully with water, it is
then necessary to install a special support.
Incase of hollow bricks wall, ensure to fill it with cement concrete completely.
After selecting a proper location, determine the positons of the two install holes used for
expansion bolts with hook, Make two holes in the wall with the corresponding depth by using
a chopping bit with the size matching the expansion bolts attached with the machine, insert
the screws, make the hook upwards, tighten the nuts to fix firmly, and then hang the electri-
cal water heater on it (see Fig.2).
Install the supply socket in the wall. The requirements for the socket are as follows: 250V/10A,
single phase, three electrodes. It is recommended to placed the socket on the right above
the heater. The height of the socket to the ground shall not be less than 1.8m (see Fig.3). If
there is fault on power cable, it should be replaced by the manufacturers, agencies or qualified
person who is able to do this so as to ensure the safety.
L (Brown)
E (Yellow/Green)
N (Blue)
If the bathroom is too small, the heater can be installed at another place. However, in order
to reduce the pipeline heat losses, the installation position of the heater shall be closed to
the location shall be as near as possible to the heater.
Expansion bolt (with hook)
≥1.8m
5
(Fig.2)
Ground
(Fig.3)