Download Print this page

Installation Instructions - GE RAVTRANS1CO Installation Instructions Manual

Transition plenum

Advertisement

Available languages

Available languages

Parts Included:
Transition Plenum
6 self-driller screws (8#12.5mm)
24 screws (10#16*12.5mm)
PVC elbow and tube for drain
Diverter baffle plates (3)
Diverter baffle support legs (4)
Mounting bracket plates (3)
Screws (2 pre-installed on MUA plate)#10-16 16.6 X12.5mm)
Screws (4 self tapping) 4.2*25mm
Installation Overview:
Adapter plenum shown installed without RAVDPLAT insta platform and installed with 3 mounting brackets in bent
Optional Make up air
port (sealed)
legs shown per side, some
installations only require 1.
Mounting brackets (3x),
optional depending on install

Installation Instructions

Self-driller screws
(8#12.5 - 6 total)
2
Screws (10#-16*12.5MM
24 total)
Screws (10#-
16*12.5MM 24
total)
Screws - 10#-
16*12.5MM
24 total
Self-driller screws
(8#12.5 - 6 total)
Self-driller screws
(8#12.5 - 6 total)
Mounting brackets (3x),
optional depending on install
Plenum Adaptor
Single Diverter Plate
Existing First Company
VTAC Plenum
Mounting brackets (3x),
optional depending on install
49-5000845 Rev. 0 10-23

Advertisement

loading