Download Print this page

Parr Instrument 4871 Operating Instructions Manual page 7

Advertisement

7. Open SpecView.
• When SpecView opens, select
"Select/Create Project" .
• The configuration which was copied
in to the C:\SV3 folder in step 4 will
appear.
• Select it and click on "go online" .
8. SpecView main screen
• SpecView should show
the configured screen
with proper values.
It is a good idea to
connect the reactor to
the 4871 at this time to
check readings.
4871 Process Controller Supplemental Instructions
7

Advertisement

loading