Panasonic FV-10VEC2 Installation And Operating Instructions Manual page 6

Energy recovery ventilator
Hide thumbs Also See for FV-10VEC2:
Table of Contents

Advertisement

WIRING METHOD
CAUTION
The capacity of wall switch, boost switch should be more than 120 V ~ 3 A to control
the power of the product.
Note
(1)The terminal of wall switch has been connected by jumper cable as factory default.
If connecting with wall switch, please remove the jumper cable.
(2)The HVAC/AHU signal cord is optional, please connect it when you want to control
the HVAC/AHU.
If connecting with HVAC/AHU, the HVAC/AHU will turn on while ERV turns on.
(3)If you are not connecting to the HVAC/AHU, please open knock-out holes for wall
switch and boost switch connection only.
(4)Insert wires into the corresponding terminals deeply through the ribs.
Make sure the screw of terminal securely fastens the copper wire and the copper
wire is not exposed.
(5)Reinstall the wiring cover and maintenance plate.
Wiring cover
Maintenance plate
HVAC/AHU signal
6
Open knock out holes
Jumper cable
Unit: inches (mm)
Copper wire
Wall switch cord/
HVAC/AHU signal
cord/Boost switch
cord
Wall Switches

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fv-10vec2hFv-10ve2Fv-10ve2h

Table of Contents