INSTALLATION CHECK LIST
LOCATION AND SUPPORT_
_1. The generator is properly located.
_2. The generator is properly supported.
_3. The generator is properly restrained.
COMPARTMENT_
_1. Compartment construction is proper.
_2. Holes/openings are vapor-sealed.
_3. Compartment size is correct.
_4. Compartment is vapor-sealed.
_5. Sound insulation is O.K.
_6. Floor cutouts property completed.
COOLING and VENTILATING AIR
_1. Air flow is adequate.
_2. Air inlet opening is correct.
_3. Compensate for restrictions
_4. Installation has been tested
GASOLINE FUEL SYSTEM
_1. Fuel tank complies with code.
_2. Fuel system properly installed.
OPTIONAL PROPANE GAS SYSTEM
_1. System is properly installed.
_2
.
Correct pressure at regulator inlet.
_3. Rated flow of primary regulator is O.K,
_4. All parts are properly installed.
_5. System was properly tested for leaks.
_6. System properly tested/adjusted.
ELECTRICAL CONNECTIONS_
_1. Comply with code requirements.
_2. Junction box properly installed.
_3. Wiring meets all standards.
_4. All connections are correct.
_5. Conduit properly installed and sealed.
_6. Generator properly bonded to vehicle.
BATTERY INSTALLATION_
_1. Recommended battery is installed.
_2
.
Recommended cables are installed.
_3. Cables are clean and tight.
_4. Cables are properly connected-
_5. Proper ventilation is provided.
POST INSTALLATION TESTS
EXHAUST SYSTEM
_
_1. All tests properly completed.
_1. Complies with code requirements.
_2. Properly and safely installed.