Download Print this page

U-Line Echelon 2275DWRROL Supplementary Manual

Echelon series full overlay drawer panel preparation and installation instructions
Hide thumbs Also See for Echelon 2275DWRROL:

Advertisement

Full Overlay Drawer Panel
Preparation and Installation
Instructions for
Models C2275DWR and 2275DWRR
www.U-LineService.com
Phone (414) 354-0300 • FAX (414) 354-7905
Service & Parts Tech Lines Phone (800) 779-2547 • FAX (414) 354-5696
OnlineService@U-Line.com
©2007 U-Line Corporation
11/2007

Advertisement

loading

Summary of Contents for U-Line Echelon 2275DWRROL

  • Page 1 Full Overlay Drawer Panel Preparation and Installation Instructions for Models C2275DWR and 2275DWRR www.U-LineService.com Phone (414) 354-0300 • FAX (414) 354-7905 Service & Parts Tech Lines Phone (800) 779-2547 • FAX (414) 354-5696 OnlineService@U-Line.com ©2007 U-Line Corporation 11/2007...
  • Page 2: Full Overlay Drawer Panels

    Full Overlay Drawer Panels Drawer Panel Preparation Full overlay drawer panels completely cover the drawer fronts and handles to give a built-in appearance. Overlay units are shipped ready for full overlay installation. Note: For standard installations, both drawers mount the same and a 1/2"...
  • Page 3: Checking Drawer Alignment

    CAUTION It is important to ensure that all drilled holes are drilled to the correct depth in order to avoid splits in the wood when hardware is installed. 4. Remove tape adjoining the panels and enlarge the five holes in the drawer panel using a 0.201" (#7) drill. 5.
  • Page 4: Adjusting Drawer Alignment

    Adjusting Drawer Alignment WARNING SHOCK HAZARD — The unit must be unplugged from the wall outlet during drawer removal, adjustment and re-installation. Drawer Removal 1. Confirm that the unit is unplugged from wall outlet. 2. Unplug the drawer’s connection wiring (top drawer only).
  • Page 5 Minor Adjustment: Note: The mounting holes on the slide are slightly larger than the screws’ diameter. 1. Loosen one slide’s mounting screws. 2. Level the slide. 3. Retighten the screws. See Figure 12. 4. Repeat procedure for Figure 12 the other slide. Severe Adjustment: Note: The slides have extra mounting holes that...
  • Page 6: Service Information

    For more than four decades, U-Line has distinguished itself as the leader in built-in undercounter ice making, refrigeration and wine storage appliances. U-Line Corporation, located in Milwaukee, WI, is a family operated manufacturer of built-in ®...

This manual is also suitable for:

Echelon 2275dwrrEchelon c2275dwr