Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for Accessory box 1 future reference. Remove all packaging and check the product for missing parts or damage before starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
Dimensions Installation ½” connecters 69mm 150mm Offset connecters Locking nuts 50mm Locking nuts Cold 278mm Shrouds 150mm Shower hose connection Before installing your new mixer, flush through the pipe work to ensure removal of debris, turn off the water supply. Prepare the wall with 2 flush ½”...
Operation Cleaning instructions The electroplating on this product is finished to the highest standard. Due care needs to be taken to ensure the appearance is retained. We recommend cleaning all products with a soft damp cloth ONLY and advise strongly against the use of all aggressive/corrosive cleaning products i.e.
Commissioning Maintenance The valve has been factory set under balanced pressures and hot water supply at 65°C. We advise that the below is carried out annually as failure to do so may result in When your specific operating conditions are significantly different from the above, the invalidation of warranty.
Page 6
•The extended guarantee is only available if you have completed the Guarantee Registration button Process. This can be done via the VADO website or via phone to our aftersales team. Registration must be completed within 6 months from date of purchase.