ViM BATE-R Instruction Manual

ViM BATE-R Instruction Manual

Circular electrical heater power control fitted
Hide thumbs Also See for BATE-R:

Advertisement

Quick Links

INSTRUCTION MANUAL
INSTALLATION | WIRING | COMMISSIONING | MAINTENANCE |
I S O 9 0 0 1
ISO 14001
Q u a l i t é
Environnement
AFNOR CERTIFICATION
AFNOR CERTIFICATION
BATE-R
Circular electrical heater
Power control fitted
NT00000591-BATE-R-AN-231018

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BATE-R and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for ViM BATE-R

  • Page 1 INSTRUCTION MANUAL INSTALLATION | WIRING | COMMISSIONING | MAINTENANCE | I S O 9 0 0 1 ISO 14001 Q u a l i t é Environnement AFNOR CERTIFICATION AFNOR CERTIFICATION BATE-R Circular electrical heater Power control fitted NT00000591-BATE-R-AN-231018...
  • Page 2: Table Of Contents

    ELECTRICAL CONNECTION ......................6 BATE-R Single phase + TJ-K10K duct probe + TR5K potentiometer ........7 BATE-R Single-phase + NTC10 room probe and TJ-K10K supply limitation probe ....8 BATE-R Three-phase + TJ-K10K duct probe + TR5K box ............9 BATE-R Three-phase + NTC10 room probe and supply limitation probe TJ-K10K ....11...
  • Page 3: General

    • Maintain a distance of 100 mm between the heater and surrounding materials. • The network must not be completely blocked. Regulation box Manual reset button Boîtier de régulation Bouton de réarmement manuel Heated Filter Filtre Pièce room chau ée TJ-K10K HEATER BATTERIE TR5K 3/16 NT00000591-BATE-R-AN-231018...
  • Page 4: Reception - Storage

    • Low +15°C and high +40°C limitation on supply, measured by the TJ-K10K probe. If the temperature measured by the probe is: - below 15°C. The heater will heat up to try to reach 15°C (low limit). - above 40°C. The heater stops heating (high limit). 4/16 NT00000591-BATE-R-AN-231018...
  • Page 5: Installation

    BATE R 400 12,000W Tri 17,3 14,0 50,0 12 000 4 600 BATE R 500 18,000W Tri +N 26,0 17,8 50,0 18 000 1 060 7 070 These datas are visible on the identification label present on each product. 5/16 NT00000591-BATE-R-AN-231018...
  • Page 6: Electrical Connection

    • Control terminal block: provide cables with a section ≤ 4 mm². • Power terminal block: the terminal block capacities are indicated in the table below: 10 mm² 16 mm² Single phase 230V ≤ 4,5kW ˃ 4,5kW Three-phase 400V ≤ 15kW ˃ 15kW 6/16 NT00000591-BATE-R-AN-231018...
  • Page 7: Bate-R Single Phase + Tj-K10K Duct Probe + Tr5K Potentiometer

    4.1 BATE-R Single phase + TJ-K10K duct probe + TR5K potentiometer Blowing temperature control. Setting the setpoint temperature on the TR5K box. Micro switch 1 held in position “1”. Micro switch 2: indifferent position BATE-R single phase - Duct temperature control...
  • Page 8: Bate-R Single-Phase + Ntc10 Room Probe And Tj-K10K Supply Limitation Probe

    4.2 BATE-R Single-phase + NTC10 room probe and TJ-K10K supply limitation probe Room temperature control and supply temperature limitation with micro switch 1 in "On" position. Micro switch 2: indifferent position. Setting the setpoint temperature on the TR5K box. BATE-R Single-phase - Room temperature control, supply temperature limitation...
  • Page 9: Bate-R Three-Phase + Tj-K10K Duct Probe + Tr5K Box

    4.3 BATE-R Three-phase + TJ-K10K duct probe + TR5K box Blowing temperature control with micro switch 1 in position “1”. Micro switch 2: indifferent position. Setting the setpoint temperature on the TR5K box. BATE-R Three-phase < 18kW - Duct temperature control...
  • Page 10 BATE-R Three-phase ≥ 18kW - Duct temperature control MICRO SWITCH RANG 1 RANK 1 LED1 LED2 L1 L2 L3 MODE CHAUFFAGE HEATING LED3 SOUS TENSION POWER ON RANG 2 RANK 2 L1 L2 L3 t° t° Shunt pour Shunt for Voir détails...
  • Page 11: Bate-R Three-Phase + Ntc10 Room Probe And Supply Limitation Probe Tj-K10K

    4.4 BATE-R Three-phase + NTC10 room probe and supply limitation probe TJ-K10K Room temperature control and supply temperature limitation with micro switch 1 in "On" position. Micro switch 2: indifferent position. Setting the setpoint temperature on the TR5K box. BATE-R Three-phase < 18kW - Room temperature control, supply temperature limitation.
  • Page 12 BATE-R Three-phase ≥ 18kW - Room temperature control, supply temperature limitation. MICRO SWITCH RANG 1 RANK 1 LED1 LED2 L1 L2 L3 MODE CHAUFFAGE HEATING LED3 SOUS TENSION POWER ON RANG 2 RANK 2 L1 L2 L3 t° t° Shunt for Shunt pour Voir détails...
  • Page 13: Commissioning - Maintenance - Alarms

    2 times per probe NTC10 (TR5K), safety air flow sensor: permanent ignition. second. second. LED 2 red On if heating Off if heater not heating LED 3 yellow On if heater is under voltage Off if heater is off 13/16 NT00000591-BATE-R-AN-231018...
  • Page 14: Maintenance And Alarm

    It is strictly forbidden to burn them, bury them or dump them illegally. 6.2 Treatment of Professional WEEE This product should not be landfilled or treated with household waste but should be taken to an appropriate collection point for waste electrical and electronic equipment (WEEE). 14/16 NT00000591-BATE-R-AN-231018...
  • Page 15 15/16 NT00000591-BATE-R-AN-231018...
  • Page 16 Les prés de Mégy Sud – SOUDAN CS 60120 - 79401 ST MAIXENT L’ECOLE CEDEX Tél. : +33 (0)5 49 06 60 38 or +33 (0)5 49 06 60 25 sav@vim.fr - www.vim.fr 16/16 NT00000591-BATE-R-AN-231018...

Table of Contents