4
Commissioning [specialist]
6. Open the fill and drain valves [7.3|3.2] by turning the valve [7.3] to position "open", see
chapter 4.1.
7. Put the flush and fill station into operation and flush the installation until clear solar fluid exits.
Vent the solar installation several times at the vent plug of the Airstop [4.2] until the solar fluid
exits without bubbles, see chapter 4.1.
8. To vent the pump section, slowly open the return ball valve [1.2], see chapter 4.1.
Consider the pressure relief valve (6 bars)!
09/2023
9.
Close the drain valve [3.2] while the filling pump
is running and increase the system pressure to
about 5 bars. The system pressure is displayed
on the pressure gauge.
10. Check the pressure gauge to see whether the
system pressure reduces and eliminate leaks
where necessary.
11. Reduce the pressure at the drain valve [3.2] to
the operating pressure of the installation.
12. Connect the expansion tank to the solar circuit
and set the operating pressure of the solar
installation by means of the flush and fill station
(for the required operating pressure, see
instructions of the expansion tank).
13. Close the fill and drain valves [7.3|9.2|3.2].
14. Turn the check valves in the ball valves [1.2|5.2|
7.1] into operating position (0°, see chapter 4.1).