Download Print this page

GRE AR1009 Instruction Manual page 3

9i pvc solar shower

Advertisement

EN
> Choose a resistant and flat surface with good exposition to the sun to install
the shower, preferably on slab stone paving or concrete.
> Drill 4 holes (diameter: 10 mm; depth: 50 mm) for the 4 bolts designed to
firmly fix the base of the tubing body.
> Put PTFE tape on the threads of the elbow tube and fix it above the shower.
> Make the connection with the water supply network with joints or with the
supplied quick connector.
Safety
The shower includes a mixer that discharges cold water at first before passing
to hot water.
The faucet makes a half-turn, do not force it at all, because the internal
cartridge could break and your shower will be definitely out of use. This mixer
does not close by pressing it, but by displacing the ceramic parts positioned
face to face. Therefore, do not exceed the limit positions at the opening or
closing.
To start, open the faucet in hot position and wait until the shower is completely
full. Once it is filled, close the faucet ("stopped") and let the water heat up
during several hours.
When the water in the tubing is hot, open the faucet until reaching the desired
temperature.
If the water continues coming out of/dripping from the nozzle, this may be due
to the pressure in the water pipes is excessive. You can reduce the pressure by
using a pressure regulator.
In very intense periods, partially empty the water from the shower before using
it, taking into account that it could be very hot, which could mean a risk of burns.
In the winter, completely empty the shower, disconnect it from the supply tubing
and safely store it indoors.
In the case o exposition of the shower to freezing temperatures, you should
know that frozen water could damage the product.

Advertisement

loading