Ledvance PHASE EV Installation Manual

Ledvance PHASE EV Installation Manual

Level 2 commercial charging station

Advertisement

Quick Links

LEDVANCE PHASE EV
Installation Guide
Level 2 Commercial Charging Station
Perfect for facility managers of office, multi-residential,
retail, education, hospitality, and other business
locations. LEDVANCE PHASE EV Level 2 Commercial
Charging Station is offered in wall mounted units or a
free-standing pedestal where two units can be
mounted side-by-side or back-to-back. With powerful
software integration from AmpUp, LEDVANCE PHASE
EV combines performance and value to deliver fast
charging at an affordable price.
Please Read All Instructions Before Attempting Installation
WARNING: TO AVOID FIRE, SHOCK OR DEATH, TURN OFF POWER at the circuit breaker or fuse and test
that the power is off before wiring! Do not remove circuit protective devices or any other component until power
is turned off.
WARNING: TO AVOID FIRE, SHOCK OR DEATH, carefully read the charging instructions in your vehicle's
manual before charging and heed the following warnings:
DO NOT put your fingers into the vehicle connector.
DO NOT use this product if the flexible power cord is frayed, has broken insulation or any other signs of damage.
DO NOT use this product if the enclosure or the EV connector is broken, cracked, open, or shows any other
indication of damage.
WHEN USING THIS DEVICE AROUND CHILDREN, supervise closely.
TO REDUCE THE RISK OF FIRE, CONNECT ONLY TO A CIRCUIT PROVIDED WITH BELOW AMPERES
maximum branch circuit over-current protection in accordance with the National Electrical Code NFPA 70
the Canadian Electrical Code, Part I, C22.1.
EVC48ALVL2C1, EVC48ALVL2C1WH,
DO NOT operate charger in temperatures outside its operating range of -22°F to 122°F (-30°C to 50°C)
Page 1 of 22
WARNING
Models
EVC48ALVL2C1GY
Circuit Breaker Rating
60A
®
, and

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PHASE EV and is the answer not in the manual?

Questions and answers

Summary of Contents for Ledvance PHASE EV

  • Page 1 Level 2 Commercial Charging Station Perfect for facility managers of office, multi-residential, retail, education, hospitality, and other business locations. LEDVANCE PHASE EV Level 2 Commercial Charging Station is offered in wall mounted units or a free-standing pedestal where two units can be mounted side-by-side or back-to-back.
  • Page 2: Table Of Contents

    Contents INTRODUCTION Safety Precautions Compliance What’s Included Tools You Will Need Specifications Unit Parts INSTALLATION Get Started Installing the Mounting Plate Preparing the Charger Mounting the Charger Electrical Wiring Current Adjustment Closing the Charger Installing the Holster and Cable Hanger How to Setup WiFi Connection OPERATION Status Light Bar...
  • Page 3: Safety Precautions

    Safety Precautions IMPORTANT: READ CAREFULLY BEFORE INSTALLING THE CHARGER. RETAIN FOR FUTURE REFERENCE. GENERAL: Upon receipt of the charger, thoroughly inspect for any freight damage which should be brought to the attention of the delivery carrier. Compliance FCC Statement: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules.
  • Page 4: What's Included

    MPE (Maximum Permissible Exposure) Requirements To satisfy FCC / IC RF exposure requirements, a separation distance of 20 cm or more should be maintained between the antenna of this device and persons during device operation. To ensure compliance, operations at closer than this distance is not recommended. Les antennes installées doivent être situées de façon à...
  • Page 5: Specifications

    Specifications FEATURES AND FUNCTIONS Charging mode Level 2 Vehicle connection SAE J1772 (Type 1 connector) Cable length 25ft Display 4.3in LCD w/charging status light bar COMMUNICATION Interfaces 4G, WiFi, Ethernet SIM card Super SIM card (shipped installed) User authentication RFID, QR Code, App Back-end protocol OCPP 1.6, upgradeable to OCPP 2.0.1 Software upgrade...
  • Page 6: Unit Parts

    Unit Parts 1. Fuse 13. Power switch 2. Debug serial port 14. Input L1 3. Download interface 15. Input L2 4. 485 interface 16. Input Ground 5. CAN interface 17. Cable Ground 6. USB interface 18. Reserved interface 7. Coin cell battery 19.
  • Page 7: Get Started

    Get Started Step 1: Subscribe to a Software Charging Plan The site host, property manager, or the owner must go to https://payments.ampup.io to subscribe to a software charging plan. A software charging plan is required to access the Community Manager portal where you will be able to customize various features that are included with your plan.
  • Page 8: Installing The Mounting Plate

    Installing the Mounting Plate 1. Remove the 2 screws – one on each side of the charger to detach the wall mounting plate from the charger. 2. Place the wall mounting plate against the wall as a template as shown in the diagram below and mark the 3 mounting holes.
  • Page 9: Preparing The Charger

    Preparing the Charger 1. Remove the cover frame from the front of the charger by unscrewing the 2 screws on top and 1 screw from the bottom of the charger. 2. Once the 3 screws are removed, carefully lift the cover outward and up to detach the cover frame. 3.
  • Page 10: Mounting The Charger

    Mounting the Charger 1. Align the charger to the wall mounting plate and hang it as shown in the illustration below. For rear wiring installation, use the included cable strain relief and feed the power supply wires through the rear port with enough length to connect the wires to the terminals.
  • Page 11: Electrical Wiring

    Electrical Wiring 1. For bottom wiring installation, use the included cable strain relief and feed the power supply wires through the bottom port with enough length to easily connect the wires to the terminals. 2. Connect the electrical wires L1, L2, and Ground to the appropriate terminals. See diagram below or refer to the Unit Parts.
  • Page 12: Closing The Charger

    Closing the Charger 1. Before closing the charger, check to make sure that all power supply wires are connected to the appropriate terminals. 2. If you plan to use an Ethernet cable (LAN cable) for your network, make sure that it is properly seated in the RJ45 port.
  • Page 13: Installing The Holster And Cable Hanger

    Installing the Holster and Cable Hanger You may place the holster and cable hanger wherever it is most convenient, being sure that the location does not place any tension on the charging cable. 1. Place the holster against the wall and mark the mounting holes. 2.
  • Page 14: How To Setup Wifi Connection

    How to setup WiFi Connection If you need to use WiFi instead of the cellular connection, please follow the steps below: 1. Power on the charger. 2. Use a smart phone, tablet, or laptop and open the WiFi settings. You will see a network name starting with “LHxxxxxxx-xxx75342”...
  • Page 15 5. Under User Options, enter your WiFi SSID and Password that you would like to use. Enter your network WiFI SSID and Password here. Aside from the WiFi SSID, WiFi Password, and New password fields, DO NOT make changes to the other fields.
  • Page 16: Status Light Bar

    Status Light Bar Charger Screens Power On Standby / Ready to Charge Page 16 of 22...
  • Page 17 Preparing – Not connected to a vehicle Preparing – Connected to a vehicle Charging Settlement / End of Session Abnormal Status Fault Page 17 of 22...
  • Page 18 Out of Service Update Status Update Successful Update Failed Vehicle is not ready to receive charge System Fault Settlement / End of Session Page 18 of 22...
  • Page 19: Charging

    If the error does not automatically reset, make sure that the charge coupler is not connected to a vehicle. Then power cycle the unit by switching the circuit breaker off and on. If the error persists, contact AmpUp Customer Service at 833-692-6787. For more information about LEDVANCE PHASE EV™, visit https://phaseev.ledvance.com/ Page 19 of 22...
  • Page 20 Fault Code Solution 11 – CP voltage anomaly Check the connection of charging connector and EV inlet. Disconnect and reconnect the charging connector. 13 – Undervoltage input Measure the input voltage to see if it is abnormal. 14 – Overvoltage input Measure the input voltage to see if it is abnormal.
  • Page 21: Warranty

    5 Year (60 months) If the Product fails to operate during the applicable Warranty Period due to a manufacturing defect, LEDVANCE will, at its sole option, replace or repair the Product or key components at no charge or grant the original purchaser a credit towards Product replacement.
  • Page 22 Warranty Period. If upon examination of the Product, LEDVANCE determines the root cause of failure to be due to a defect in materials or workmanship, LEDVANCE will provide the appropriate remedy as set forth above. LEDVANCE reserves the right to (i) examine all Product to determine the cause of failure and (ii) be the sole judge as to whether a Product is defective and covered under this warranty.

Table of Contents