SAFETY INFORMATION GENERAL SAFETY PRECAUTIONS The following precautions are an integral and essential part of the product and must be supplied to the user; Read them carefully as they contain important indications for the safe installation, use and maintenance. 1. These instructions must be kept and forwarded to all possible future users of the system. 2.
Page 3
A gate operator shall be provided with the specific instructions describing all user adjustments required for proper operation of the gate. Detailed instructions shall be provided regarding user adjustment of any clutch or pressure relief adjustments provided. The instructions shall also indicate the need for periodic checking and adjustment by a qualified technician of the control mechanism for force, speed, and sensitivity.
Page 4
The guarantee will be void and the manufacturer responsibility will be nullified if SEA USA Inc. original spare parts are not being used. The electrical installation shall be carried out by a professional technician who will release documentation as requested by the laws in force.
CHANGES TO UL 325 ED. 6TH FOR GATE OPERATORS Starting on Jan. 12, 2016, new UL 325 changes take effect, bringing a series of new mandates for the gate operator industry. Here’s a quick guide to the key modifications 1. E : Gate operators are required to have a minimum of two independent means of NTRAPMENT PROTECTION DEVICES...
Page 6
GATE WARNINGS AND PRECAUTIONS Check that the gate is in good running order before the installation: the gate must be rigid and straight and must run smoothly throughout its travel the length of the gate must comply with the max. length recommended for each operator model the weight of the gate must comply with max.
TAURUS RACK 120V/24V TAURUS RACK 120V TAURUS CHAIN GP 120V TECHNICAL DATA 120V (±5%) 50/60 Hz 120V (±5%) 50/60 Hz 120V (±5%) 50/60 Hz OWER UPPLY 110W 350W 350W OTOR POWER 1,8 A 3,2 A 3,2 A BSORBED CURRENT 60 µF 60 µF...
Page 9
3 - INSTALLATION OF THE FOUNDATION PLATE for «TAURUS RACK» To install the foundation plate it is necessary to: 3.1. Prepare a concrete basement according to the dimensions shown in Fig. 4; The foundation plate and the anchor bolts must be concreted inside the basement...
6 - GEAR RACK MOUNTING for «TAURUS RACK» 6.1. Release the operator and open the leaf completely; 6.2. Fix on each gear rack element the support pawls with the appropriate lock screws, making sure to put them in the upper part of the hole (Fig. 9) ;...
Page 11
8 - FOUNDATION BASE ASSEMBLY for «TAURUS CHAIN» HOLES DISTANCE Fig. 18 Fig. 17 9 - INSTALLATION OF THE OPERATOR ON THE FOUNDATION BASE Fig. 19...
Page 12
10 - CONCRETE PAD AND INSTALLATION of «TAURUS CHAIN» To install the foundation plate it is necessary to: 10.1. Prepare a concrete pad according to the dimensions shown in Fig. 20 - use R425 concrete type 10.2. Foreseen the passage for a flexible plastic pipe of at least 1,20 inches in diameter into the basement for the electric cables passage 10.3.
Page 13
11 - INSTALLATION OF THE CHAIN SYSTEM 11.1. Secure two sturdy brackets at the two extremities of the gate for attaching the chain - Fig. 24 11.2. Install a chain tensioners on each bracket to adjust the chain tension - Fig. 24 1,77 - Fig.
Page 14
-CLOSING- UPPER POSITION LOWER POSITION Fig. 32 13 - RELEASE SYSTEM - for both «TAURUS RACK» and «TAURUS CHAIN» 13.1. T O RELEASE THE OPERATOR Open the lock cover, insert the key and rotate 90° clockwise - Fig. 33 Pull the release lever until it stops, about 90°...
INTENDED USE: The operator has been designed to be used for the automation of sliding gates only SPARE PARTS: Send request for spare parts to: SEA USA Inc. - Doral - MIAMI - (FL) 33172 - www.sea-usa.com SAFETY AND ENVIRONMENTAL COMPATIBILITY: Don’t waste product packing materials and/or circuits STORAGE: T = -4°F/+149°F ;...
Page 16
SEA USA Inc. 10850 N.W. 21st - unit 160 - Doral - Miami FLORIDA (FL) 33172 Phone: ++ 1 - 305.594.1151 www.sea-usa.com...
Need help?
Do you have a question about the TAURUS RACK and is the answer not in the manual?
Questions and answers