Relocation Procedures - Haier 1U22KAEFRA Installation Manual

Table of Contents

Advertisement

Relocation Procedures

@月
a. Fix the OREO module on the board through the bayonet.
b. Reinforce OREO module with screw.
c. Connect contractor supplied line and ORM line.
d. Secure the ORM line with clamp and secure with screw.
e. Connect contractor supplied line with PCB through interface CN14.
Refit the stop valve cover.
3
Note: In case relocation is required, the joint of evaporator gas/liquid pipes of the indoor unit shall be cut off with
a cutting knife. Connection is only allowed after re-flaring (the same to the outdoor unit).
a
b
Relocation Procedures
,,
contractor supplied line
,,
. ,
c
8
d

Advertisement

Table of Contents
loading

Table of Contents