Mitsubishi Electric Mr.Slim PUZ-HA30NHA2 Service Manual page 53

Table of Contents

Advertisement

11-9. TEST POINT DIAGRAM
Outdoor controller circuit board
PUZ-HA30NHA
PUZ-HA36NHA
SW7
Demand control setting
SW6
Model select
SW4
Test operation
SWP
Pump down
SW5
Function switch
SW8
Pipe replace
Wiring replace
CNM
Connect to A control
service tool
CNMNT
Connect to
M-NET adapter(CN5)
CNVMNT
Connect to
M-NET adapter(CND)
LEV-A,B,C
Linear expansion
valve
63L
Low pressure
switch
TH4
Thermistor
<Discharge>
TH3
Thermistor
<Outdoor pipe>
TH7/6
Thermistor
<Outdoor/
2-phase pipe>
63H
High pressure
switch
TH32, TH33
Thermistor
(Outdoor pipe>
V
FG
(TEST POINT 4)
(Voltage between
right pins of PC5C
and PC5D, pin 3
and pin 4)
(Same as
(CNF1
7
(+)-
4
(-))
V
SP
(TEST POINT 3)
(Voltage between pins
of C5A, C5B):
DC 0V(when stopped),
CNF1, CNF2
DC 1– 6.5V
Connect to the fan motor
(when operated)
1-4: 280V DC
5-4: 15V DC
6-4: 0-6.5V DC
7-4: 15V DC(When stopped)
7.5V DC(When operated)
(0V-15V pulse)
PUZ-HA30NHA2
SW1
Forced defrost, detect history record reset,
refrigerant address
CNDC
280V DC (1+, 3-)
(Outdoor power circuit
board
53
<CAUTION> TEST POINT1 is high voltage.
PUZ-HA36NHA2
CN51
External signal output
• Compressor operat-
• Abnormal signal
CNDM
1 to 2:
Input of low-level
sound priority mode
1 to 3:
Input of external con-
tact point
CN52C
(Connect to the noise
filter circuit board
(CN52C))
CN4
Transmission to out-
door power circuit
board (CN4)
SV2
Bypass valve
21S4
Four-way valve
CN2
Connect to the outdoor
power circuit board (CN2)
1-5: Reception from
2-5: Zero cross signal
3-4: 18V DC
6-5: 16V DC
7-5: 16V DC
CNAC
2 to 4:
Power supply for out-
door controller circuit
board (208/230V AC)
1 to 3:
Power supply for indoor
and outdoor unit connec-
tion wire
(208/230V AC)
CNS
S1-S2: 208/230V AC
+ -
Communication power supply
D71 Voltage
24V DC
ing signal
power circuit board
(0-5V DC)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents