LG GM-652R CE Series Owner's Manual page 20

Bottom freezer refrigerator
Table of Contents

Advertisement

20 INSTALLATION
NOTE
• Do not over tighten clamp or you may crush the
tubing.
Pipe Clamp
Inlet End
Clamp Screw
Washer
6
Route the tubing.
• Route the tubing between the cold water
line and the refrigerator. Route the tubing
through a hole drilled in the wall or floor
(behind the refrigerator or adjacent base
cabinet) as close to the wall as possible.
NOTE
• Be sure there is sufficient extra tubing (about 8
ft. coiled into three turns of about 10 in.
diameter) to allow the refrigerator to move out
from the wall after installation.
7
Connect the tubing to the valve.
• Place the compression nut and ferrule
(sleeve) for copper tubing onto the end of
the tubing and connect it to the shutoff
valve. Make sure the tubing is fully inserted
into the valve. Tighten the compression nut
securely.
Saddle-Type Shutoff Valve
Compression Nut
Packing Nut
Outlet Valve
Ferrule (sleeve)
8
Flush out the tubing.
• Turn the main water supply on and flush
out the tubing until the water is clear. Shut
the water off at the water valve after about
one quart of water has been flushed
through the tubing.
9
Connect the tubing to the refrigerator.
NOTE
• Before making the connection to the
refrigerator, be sure that the refrigerator power
cord is not plugged into the wall outlet.
• Remove the plastic flexible cap from the water
valve.
• Place the compression nut and ferrule (sleeve)
onto the end of the tubing as shown.
NOTE
• Insert the end of the copper tubing into the
connection as far as possible. While holding the
tubing, tighten the fitting.

Advertisement

Table of Contents
loading

Table of Contents