Electrical Connection; Gear; Safety Check - HADEF EEE Installation, Operating And Maintenance Instructions

Single girder electric overhead travelling crane
Table of Contents

Advertisement

Pos: 13.2.1.2 /1_HADEF/---ALLGEMEIN/Hinweise/Prüfungen/HINWEIS - Prüfung durch befähigte Pesonen @ 0\mod_1177339966681_52.docx @ 5319 @ @ 1
NOTICE!
Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a "qualified
person" before putting into operation for the first time.
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley
movement, must be tested by a "licensed qualified person" before putting in operation.
An exception is "hoists ready for operation" acc. validated national regulations with EU-declaration of
conformity.
Definition "qualified person" (former expert)
A "qualified person" has learned, due to occupational training and experience and the job that the person has
done, the skills needed to tests the material for one's work.
Definition "licensed qualified person" (former approved expert)
A "licensed qualified person" has, due through special occupational training, knowledge about testing of the
material for one's work and knows the national accident prevention regulations and other prescriptions and
technical regulations. This person must test the material for one's work regularly with regard to design and
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS).
Pos: 13.2.2.1 /1_HADEF/9--INBETRIEBNAHME/Allgemein/Stromanschluss/02.Stromanschluss - Alle Krane @ 2\mod_1287558617540_52.docx @ 16448 @ @ 1
9.2

Electrical connection

9.2.1
Main connection
Technical data of motors see chapter "technical data" or take it from the type plates.
Wiring diagrams or fusing information of supply see next table.
Choose the wire cross section acc. VDE 0100
Install cable ends with cable skinner
Put the connection cable strain-relieved into the connection plug
Protect the supply line acc. VDE 100
9.2.2
Control connection
Control cable with connection plug as standards. Plug in for setting in operation.
Changes at connection cable are only allowed by am expert.
9.2.3
Cable connection - brake
The service reduced co-current spring pressured brakes are installed acc. wiring diagram at works
Pos: 13.2.3 /1_HADEF/9--INBETRIEBNAHME/Allgemein/Zuordnung Schaltpläne/03.Zuordnung Schaltpläne - Krane @ 2\mod_1287558939682_52.docx @ 16455 @ @ 1
9.2.4
Wiring diagrams
Wiring diagrams for standard and special cranes are placed in the control box.
Pos: 13.2.4 /1_HADEF/9--INBETRIEBNAHME/Allgemein/Zuordnung Leitungen/04.Zuordnung Leitungen - Krane @ 2\mod_1287559125388_52.docx @ 16459 @ @ 1
9.2.5
Cable cross section and fuse protection
Provide cable cross section and fuse protection acc. VDE 100.
For totally demand add all motor demand data. See crane test book.
Pos: 13.2.5.1 /1_HADEF/9--INBETRIEBNAHME/Allgemein/Getriebe/05.Getriebe - Sonstige @ 0\mod_1175600728406_52.docx @ 3050 @ @ 1
9.3

Gear

Pos: 13.2.5.2 /1_HADEF/---ALLGEMEIN/Hinweise/HINWEIS - Verschluss-Entlüftungsschraube @ 1\mod_1259676576858_52.docx @ 11347 @ @ 1
NOTICE!
For transport, some gear types are fitted with a plug screw. Replace the plug screw by a ventilation screw
(attached) before putting the unit into operation.
Pos: 14.1 /1_HADEF/10-SICHERHEITSPRÜFUNG/*Ü1*/#. Kapitel - Sicherheitsprüfung @ 0\mod_1172647514342_52.docx @ 401 @ @ 1
10

Safety check

Pos: 14.2 /1_HADEF/10-SICHERHEITSPRÜFUNG/Allgemein/01.Sicherheitsprüfung Alle @ 0\mod_1178197796463_52.docx @ 5700 @ @ 1
Before putting into service initially or when putting back into service, it must be checked whether:
All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured.
Pos: 14.3 /1_HADEF/10-SICHERHEITSPRÜFUNG/Allgemein/02.Sicherheitsprüfung Zusatz E+P @ 0\mod_1178197432766_52.docx @ 5694 @ @ 1
The oil levels in the gear boxes are sufficient.
All movements of the load comply with the symbols on the control switch.
Pos: 15.1 /1_HADEF/11-FUNKTIONSPRÜFUNG/*Ü1*/#. Kapitel - Funktiosprüfung @ 0\mod_1176446880639_52.docx @ 4028 @ @ 1
5.52.707.00.01.02
13

Advertisement

Table of Contents
loading

Related Products for HADEF EEE

Table of Contents