SHELF INSTALLATION:
There is one shelf bracket for each arch hoop including the end ones
There are four shelf brackets for an end wall shelf (1 on each stud and 1 on each end hoop
1. Position a shelf bracket at the same height at each end using three screws into the uprights, see image S1
Position a string line between the two end brackets, check that it is level and pull it tight.
2. Position the center shelf bracket(s) at the string line height
3. There are 5 aluminium 25 x 25mm shelf slats. The slats finishes flush with shelf bracket at their ends. see image S3
4. Fit the front and rear shelf slats using the screws provided and screw through the pre-drilled shelf bracket holes from the underside, see
image S2.
5. Fit the remaining three slats and space them evenly there will be an approximate 36mm gap between each slat.
S1 - Fold faces inwards
S2 - Position rear and front slat
S3 - Slats finish 30mm from end
Tunnel Operation + Maintenance schedule:
Close roof vents, doors and windows in windy conditions.
* Clean your greenhouse once per year to remove algae / pollen / dirt. Use dishwashing liquid and a soft broom.
* Wash down the interior of the tunnel house to prevent degradation of the covers or alloy or steel parts
* Repair with greenhouse film tape and holes,rips or tears
* Treat any steel parts such as Vent, Saddles, Plates, Door hangers etc. with rust kill once yearly or if corrosion appears.
* Check for any loose or missing screws each 12 months, Tighten or Replace as needed.
* Check foundation attachment and foundations are secure each 12 months to ensure tunnel is well held in place from wind
* Each 7-10 years replacement cover kit may be purchased online
www.redpath.co.nz
for all sizes of tunnel kits.
Effective from 31-Oct-23
Page | 15

Advertisement

loading
Need help?

Need help?

Do you have a question about the Tunnelhouse Mk2 and is the answer not in the manual?

Questions and answers