Installation and maintenance guide
3 GETTING STARTED
3.1 Pump 005/ 015 / 050 / 150 / 500 / 1000 composition
1 : Stator
2 : Rotor assembly
3 : Chamber
4 : Motor assembly
5 : Box
6 : Installation tool
7 : Screws, Compass
3.2 Notes before use
> Use the accessories specified by DAV Tech. For the choice of nozzles, evaluate according to the
quantity to be dispensed and the desired application result.
> Keep the pump, its components and accessories clean and protect them from dust or
contamination.
> Replace consumable materials such as syringes and nozzles at every use and clean
contaminated parts such as rotor and stator.
> The digital transducer of the air pressure regulator gives stable results after about 20 minutes
from the start.