Craftsman AXS 706.59668 Owner's Manual page 15

6-drawer chest 7-drawer roll-a-way
Table of Contents

Advertisement

CHEST TOP INSTALLATION
AND REMOVAL
(With task light)
Tools
Required:
3/8" Wrench
Chest
Top Removal
• Disconnect
power from unit.
• Remove
enough
drawers
to reach the
top back inside
of the unit. (See
Drawer
installation
and removal.)
• Push actuator
rod to back of unit to
disconnect
from back of lock.
Move
actuator
rod for access.
• Remove
(4) screws
holding
top in
place.
• Lift top off of unit enough
to reach the
wiring
harness.
• Disconnect
wiring
harness
from unit.
• Remove
top from unit.
Chest
Top Installation
• Connect
wiring
harness
to top.
• Position
top on unit.
• Attach
using (4) screws.
• Make sure the back of the actuator
rod is inserted
into the actuator
rod
holder
in the back of the unit.
• Push actuator
rod toward
back of unit
and line up with lock. Insert the
actuator
rod into the back of the lock.
• Test lock operation.
• Reinstall
drawers.
• Reconnect
power to the unit.
Top
Press to
release
Disconnect
actuator
rod
Actuator
rod
holder
Remove
screws
DRAWER
AND WORK
SURFACE
INSTALLATION
AND REMOVAL
Note: For pull out work surface without
task light, follow drawer removal
instructions.
DRAWER
• Empty the drawer.
• Fully extend
the drawer.
Release
Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride
over the stops.) Pull out
to remove.
Tab Style - Depress the
release tabs on both
sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.
• To reinstall,
carefully
align the slides
and push the drawer
into the unit until
the drawer
stops.
PULL
OUT WORK
SURFACE
WITH
TASK
LIGHT
Removal
• Disconnect
the power from the unit.
• Remove
enough
drawers
to gain
access
to connections
in the back of
the roll-away
behind
the work surface.
• Unplug
work surface
cord from back of
roll-away.
• Remove
and save back retaining
clip.
• Disconnect
chain inside
back of roll-
away. (Move
chain toward
large round
part of slot. Pull out to remove.)
• Remove
the work surface.
(See
drawer
removal
instructions.)
Retaining
Chain
Installation
• To reinstall,
carefully
align the slides
and push the work surface
into the unit
until the work surface
stops.
• Depress
release
tabs in back corners
of the extendable
work surface.
• Push the work surface
into the unit to
the fully retracted
position.
• Extend
work surface
far enough
to
gain access
to connections
in back.
• Connect
chain inside
back of roll
away. (Insert
chain into the large
round part of the slot. Slide chain to
small end of slot.)
• Insert retaining
clip to hold chain in
place.
• Plug work surface
cord into back of
roll-away.
• Reconnect
power to the unit. (See:
Connecting
power.)
• Check work surface
and task lighting
for proper
operation.
• Reinstall
drawers.
5
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Axs 706.59669Axs 706.596680Axs 706.596690

Table of Contents

Save PDF