Efco SWAPLOADER SL-412 Parts And Operation Manual page 64

Table of Contents

Advertisement

 
contact with the jib lockout valve roller. The roller should be depressed by the valve ramp so
that 1/8" to 3/16" of the roller is exposed from the end cap (see illustration below).
ADJUSTMENT
Should the jib lockout valve need adjustment follow the steps below (refer to the illustration on
the previous page).
1. Loosen the mount bracket screws enough that the mount bracket can slide.
2. Place a 1/16" spacer between the roller and the ramp.
3. Tighten the adjustment bolt until the roller is completely or near completely compressed.
4. Tighten the mount bracket screws.
5. Remove the spacer.
6. Test function.
PART NUMBER &
SwapLoader
Pt. No.
23P04
Please contact your SwapLoader Distributor or SwapLoader USA should you have any
questions regarding this procedure.
4-6
SPECIFICATION
Work Port Size
7/8-14 ORB (SAE 8)
2-Way, 2-Position N.C.
Spool Type
Section IV: Maintenance 
 
4.0.MAI.SL-412

Advertisement

Table of Contents
loading

Table of Contents