Efco SWAPLOADER SL-412 Parts And Operation Manual page 29

Table of Contents

Advertisement

 
5. After the start procedure has been completed on the hoist, verify that the movement of each
control lever corresponds to the movement of the cylinders per the figure below. Operate the
stabilizer through 5 to 8 cycles to remove the air from the hydraulic cylinders and lines.
2.0.INS.SL-412
Section II: Installation 
2-15

Advertisement

Table of Contents
loading

Table of Contents