Commissioning; Precautions When Commissioning; Checklist Before Commissioning - Daikin RXM20A5V1B Installer's Reference Manual

Hide thumbs Also See for RXM20A5V1B:
Table of Contents

Advertisement

12 Commissioning

In this chapter

12.1 Precautions when commissioning

12.2 Checklist before commissioning

RXM-A, ARXM-A
R32 split series
4P718129-3A – 2023.07
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during commissioning
and hand-over to the user.
12.1
Precautions when commissioning..........................................................................................................................................
12.2
Checklist before commissioning.............................................................................................................................................
12.3
Checklist during commissioning .............................................................................................................................................
12.4
To perform a test run .............................................................................................................................................................
12.5
Starting up the outdoor unit ..................................................................................................................................................
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
CAUTION
Do NOT perform the test operation while working on the indoor units.
When performing the test operation, NOT ONLY the outdoor unit, but the connected
indoor unit will operate as well. Working on an indoor unit while performing a test
operation is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
NOTICE
Turn ON the power 6 hours before operation in order to have power running to the
crankcase heater and to protect the compressor.
During test operation, the outdoor unit and the indoor units will start up. Make
sure that the preparations of all indoor units are finished (field piping, electrical
wiring, air purge, ...). See installation manual of the indoor units for details.
1 After the installation of the unit, check the items listed below.
2 Close the unit.
12
Commissioning
|
Installer reference guide
55
55
55
56
56
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents