Rheem RHBL Series Installation Instructions Manual page 34

Front return air handlers
Table of Contents

Advertisement

34
9. Tilt the coil assembly forward. (Note: Depending upon the amount of slack in the
refrigerant lines, the system may have to be evacuated and the suction and liquid
line of the air handler may have to be uninstalled from the system in order to prevent
damage to the refrigerant lines which could result in a total loss of refrigerant)
10. Remove the 2 sheet metal screws that attached the blower to the bottom of the
blower shelf. (1/4" Socket)
11. Remove the 3 sheet metal screws which attached the blower to the blower shelf
located in the air handler control box. (3/8" Socket)
12. Lower the blower and turn assembly counter clockwise with the motor pointing
towards the top of the air handler.
Remove 1 Sheet
Metal Screw
From Each Side
of Blower
Remove Screws

Advertisement

Table of Contents
loading

Table of Contents