Defrost Operation Control - Fujitsu AG G12LVCB Series Service Instruction

Split type room floor type inverter
Hide thumbs Also See for AG G12LVCB Series:
Table of Contents

Advertisement

21. DEFROST OPERATION CONTROL

1. CONDITION OF STARTING THE DEFROST OPERATION
The defrost operation starts as shown in the following Table 18.
(Table 18 : Condition of starting Defrost Operation)
Normal defrost
Integrating defrost
2. CONDITION OF THE DEFROST OPERATION COMPLETION
Defrost operation is released when the conditions become as shown in Table 19.
(Table 19 : Defrost Release Condition)
Outdoor heat exchanger temperature sensor value is higher than +16°C or
Compressor operation time has passed 15 minutes.
Less than 25 minutes (09/ 12L)
Less than 40 minutes (14L)
Does not operate
More than 240 minutes
(For continuous operation)
Outdoor heat exchanger
temperature below -3°C
If the compressor continuous operation time is less than 10 minutes,
the OFF number of the compressor is counted.
If any defrost operated, the compressor OFF count is cleared.
Release Condition
01-15
Compressor integrating operation time
More than 25 minutes (09/ 12L)
More than 40 minutes (14L)
Outdoor heat exchanger temp. < -17°C
(at outside air temp. > -10°C)
Outdoor heat exchanger temp. < Outside air temp.- 7°C
or Outdoor heat exchanger temp. < - 25°C
Compressor integrating operation time
More than 213 minutes
(For continuous operation)
Outdoor heat exchanger
temperature below -5°C
=
=
=
=
(at outside air temp. < -10°C)
Less than 10 minutes
( For intermittent operation )
OFF count of the compressor
40 times

Advertisement

Table of Contents
loading

Table of Contents