Summary of Contents for Phoenix Mecano Rose EJB Series
Page 1
Instruction Manual for Power Distribution, Switchgear and Control Assembly –EJB Series All work on this Ex-equipment must be carried out only by qualified Specialist personnel following EN/IEC 60079-14. Any subsequent Modification must be within framework of this operation manual The operating permit expires in the event of non-compliance! IM.EJB.X.01.2019 IECEx/ATEX Page 1...
Observe the following information during installation and operation Remove all foreign bodies (e.g. uncertified plugs for transportation) from enclosure. Any damage may compromise the explosion protection National and local safety regulation National and local accident prevention regulations ...
Technical Data Manufacturer: ROSE Systemtechnik GmbH Erbeweg 13-15, 32457 Porta Westfalica, GERMANY Explosion Protection: IECEx Gas: Ex db IIB+H T6/T5/T4 Gb Dust: Ex tb IIIC T85⁰C/T100⁰C/T135⁰C Db ATEX Gas: II 2 G Ex db IIB+H T6/T5/T4 Gb Dust: II 2 D Ex tb IIIC T85⁰C/T100⁰C/T135⁰C Db IECEx Certificate of Conformity No: IECEx DEK 18.0074 X EC Type examination Certificate No: DEKRA 18ATEX0118 X Electrical Data...
Page 5
PERMISSIBLE ENTRIES FROM EACH SIDE SIZE SIDE EJB 01 EJB 02 EJB 03 EJB 04 EJB 06 EJB 07 EJB 09 EJB 10 Short side M20 or 1/2"NPT Long side Short side M25 or 3/4"NPT Long side Short side M32 or 1"NPT Long side Short side M40 or 1.1/4"NPT...
Installation conditions Built in components The T Class is dependent on power dissipation of components, wiring and Max ambient temperature. Refer Technical data. No batteries & fans are permitted. Only replacement of components built inside the enclosure is permitted. Any addition or alternation without consultation to ROSE is not permitted and may lead to ignition risk.
Electrical Connection Internal wiring Incorrect wiring inside enclosure! Strictly adhere to wire size and length for which heat loss dissipation are taken into account for permissible wattage for a given T Class. In case of non-compliance explosion protection can no longer be guaranteed. ...
Commissioning Check the device before putting it into service! To ensure proper operation the equipment must be checked prior to putting it in service. If the enclosure is connected incorrectly, explosion protection is no longer guaranteed! The device must be operated only with completely closed enclosures. Before commissioning ensure that: ...