Beissbarth MT ZERO 6 LCD Translation Of The Original Operating Instructions page 16

Table of Contents

Advertisement

en
82 | MT ZERO 6 LCD | Initial commissioning
3. Remove the screws from the bottom holes on the
back of the casing.
Fig. 14:
Removing the bottom screws
4. Position the screws and washers on the top
holes leaving at least 5 mm of space between the
structure's wall and the washer.
≥5mm
Fig. 15:
Positioning the top screws
5. Anchor the protective hood of the moving unit by
aligning the top holes of the unit with the screws
previously put in place.
!
Make sure not to crush the cables extending from
the bottom of the unit.
|
1 695 600 968
2019-01-28
6. Push the unit down, and make sure the screws are
positioned correctly and as far in the holes as they
will go.
i
The unit must be parallel to the structure.
Fig. 16:
Anchoring the moving unit
7. Position the screws and washers previously removed
on the bottom holes, but do not tighten them yet.
Fig. 17:
Positioning the bottom screws
8. Tighten the top screws on the holes in the unit with
the tool.
Fig. 18:
Tightening the top screws
Beissbarth GmbH

Advertisement

Table of Contents
loading

Related Products for Beissbarth MT ZERO 6 LCD

This manual is also suitable for:

Mt zero 6 lcd oemMt zero 6 lcd bmw

Table of Contents