Download Print this page
Maytag MDG78PNAWS Installation Manual

Maytag MDG78PNAWS Installation Manual

Maytag® commercial energy advantage™ on-premises drying tumbler

Advertisement

Quick Links

MDG78PN Installation Manual

Advertisement

loading
Need help?

Need help?

Do you have a question about the MDG78PNAWS and is the answer not in the manual?

Questions and answers

Summary of Contents for Maytag MDG78PNAWS

  • Page 1 MDG78PN Installation Manual...
  • Page 2 Dryer Safety DANGER WARNING...
  • Page 4 Table of Contents ________ Important Information ________________ IMPORTANT: WARNING List of Acronyms _____________________...
  • Page 5 Specifications _____________________________________________________________________ NOTE:...
  • Page 6 Specifications _____________________________________________________________________...
  • Page 7 Installation Procedures _______________ WARNING Leveling Dryer Tools Required Installing Door Handle Location Requirements _______________ WARNING IMPORTANT: IMPORTANT:...
  • Page 8 Dryer Enclosure Requirements _______ Fresh Air Supply Requirements _______ IMPORTANT: NOTE: Exhaust Requirements ________________...
  • Page 9 WARNING IMPORTANT: NOTE: Outside Venting Protection IMPORTANT: Single Dryer Venting IMPORTANT:...
  • Page 10 Multiple Dryer (Common) Venting IMPORTANT: IMPORTANT: Electrical Information _________________ Electrical Requirements IMPORTANT: NOTE: NOTE: IMPORTANT: Electrical Service Specifications...
  • Page 11 Grounding Electrical Connections WARNING 120 Volt Application with Neutral Single-Phase (1ø) Wiring Connections/Hookup Gas Models Only 120V Application with Neutral Gas Information _______________________ WARNING Type of Gas...
  • Page 12 IMPORTANT: NOTE: IMPORTANT:...
  • Page 13 Heat Input/Orifice (Injector) Data Gas Connections Piping/Connections NOTE: IMPORTANT: Gas Pressure Test Procedure WARNING...
  • Page 14 WARNING Water Information ____________________ Before You Start Check Local Codes and Permits IMPORTANT: Installing the S.A.F.E. System...
  • Page 15 NOTE: NOTE: NOTE: NOTE: Preparation for Operation/Start-Up ___ Preoperational Test ___________________ NOTE: Tumbler Coating Microprocessor Programs/Selections Operating Instructions ________________ NOTE:...
  • Page 16 Shutdown Instructions ________________ Service/Parts Information ____________ Service NOTE: Parts NOTE: Routine Maintenance _________________ Cleaning NOTE: Suggested Cleaning Schedule Every Third or Fourth Load NOTE: IMPORTANT: Weekly 90 Days WARNING Every 6 Months NOTE:...
  • Page 17 7 Days After Installation and Every 12 Months Thereafter Data Label Information _______________ Standard Label Model Number Serial Number Type of Heat Heat Input Orifice Size Electric Service Gas Manifold Pressure...

This manual is also suitable for:

Mdg78pn