ZUCCHETTI ACUABLU ZA5699 Instruction For The Installation

ZUCCHETTI ACUABLU ZA5699 Instruction For The Installation

Faucets

Advertisement

I
GB
F
D
E
RU
PL
ZA5699 - ZA5715
Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it
ISTRUZIONI PER L'INSTALLAZIONE DELLA RUBINETTERIA
INSTRUCTIONS FOR THE INSTALLATION OF THE FAUCETS
INSTRUCTIONS POUR L'INSTALLATION DE LA ROBINETTERIE
MONTAGEANLEITUNGEN ZUR INSTALLATION DER ARMATUREN
INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA
ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ
INSTRUKCJE INSTALACJI ARMATURY
Zucchetti Rubinetteria S.p.A.
Z93764

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACUABLU ZA5699 and is the answer not in the manual?

Questions and answers

Summary of Contents for ZUCCHETTI ACUABLU ZA5699

  • Page 1 INSTRUCCIONES PARA LA INSTALACION DE LA GRIFERIA ИНСТРУКЦИИ ПО МОНТАЖУ СМЕСИТЕЛЬНОЙ АРМАТУРЫ INSTRUKCJE INSTALACJI ARMATURY ZA5699 - ZA5715 Z93764 Zucchetti Rubinetteria S.p.A. Via Molini di Resiga, 29 - 28024 Gozzano (No) - Italy - Tel. +39 0322 954700 - Fax +39 0322 954823 - zucchettidesign.it...
  • Page 2 ZA5699-ZA5715 INSTALLAZIONE / INSTALLATION 17mm (mm) 7-12 13-19 20-26 27-33 34-40...
  • Page 3 ZA5699-ZA5715 INSTALLAZIONE / INSTALLATION...
  • Page 4 ZA5699-ZA5715 Z93764 INSTALLAZIONE / INSTALLATION...
  • Page 5 ZA5699-ZA5715 Z93764 INSTALLAZIONE / INSTALLATION...
  • Page 6 Recommended temperat.: 60-65°C Zucchetti taps can be used with electric storage water heathers and instant gas types, centralised system, combi wall-mounted gas boilers and district heating systems. Before connecting the taps we recommend draining the system thoroughly; it is also advisable to install under basin stop valves with filter (art. Z9126P). Should the water pressure be higher than 5 bar, a pressure reducer should be fitted upstream of the supply pipes.

This manual is also suitable for:

Acuablu za5715Acuablu z93764

Table of Contents