Viessmann WB1A007 Installation And Service Instructions Manual page 59

Table of Contents

Advertisement

Steps
(continued)
S
Start-up and Maintenance
ervice
S
Start-up and Maintenance
ervice
Initial Start-up, Inspection and Maintenance
20. Check gas pipes and fittings for leaks
WARNING
The gas supply piping must be leak
tested before placing the boiler in
operation.
21. Reinstall burner
CAUTION
Ensure all joints of gas line are
pressure tight and that gas valves do
not leak when under normal
operating pressure (use approved
leak detection liquid).
1. Replace electrical cables from fan
motor
, mount burner, and
diagonally tighten 4 torque screws
(approx. 3 ft.lbs./4 Nm using a
calibrated torque wrench).
2. Insert new gasket and tighten the
fitting
on the gas connection
pipe.
3. Insert air pressure switch connection
pipe
onto the gas valve "OUT"
connector (P2 on the switch).
4. Replace electrical cables from gas
valve
, and ignition transformer
unit
.
5. Open gas shutoff valve and switch
on power supply.
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 100-w

Table of Contents