Set a constant voltage input of UL1 = 63.5 V at 0° and UL2 = 63.5 V at 180° secondary and a
current signal at IL1 = 1A at 0° and IL2 = 1A at 180°.
3.
Ensure that the P output of CMMXU function has exceeded 10 MW and remains stable.
4.
Change the current signal at IL1= 2A at 0° and IL2= 2A at 180°. Both START and STARTRISE
signals should be active for 100 ms.
5.
Change the current signal at IL1= 1A at 0° and IL2= 1A at 180°. Both START and STARTLOW
signals should be active for 100 ms.
11.8.5.2

Completing the test

Continue to test another function or end the test by changing the TestMode setting to Disabled. Restore
connections and settings to their original values, if they were changed for testing purposes.
11.9

Control

11.9.1

Single command, 16 signals SINGLECMD

For the single command function block, it is necessary to configure the output signal to corresponding
binary output of the IED. The operation of the single command function (SINGLECMD) is then checked
from the local HMI by applying the commands with Mode = Off, Steady or Pulse, and by observing the
logic statuses of the corresponding binary output. Command control functions included in the operation of
different built-in functions must be tested at the same time as their corresponding functions.
11.10

Logic

11.10.1

Tripping logic, common 3-phase output SMPPTRC (94)

Prepare the IED for verification of settings outlined in Section
This function is functionality tested together with other protection functions (line differential protection,
ground-fault overcurrent protection, and so on) within the IED. It is recommended that the function is
tested together with the autorecloser function, when built into the IED or when a separate external unit is
used for reclosing purposes.
11.10.1.1

Function revision history

Document
revision
A
B
C
D
Table continues on next page
Phasor measurement unit RES670
Commissioning manual
Operation = ON
MinStVal = 10
DelSt> = 100
DeltaT = 7
tHold = 100
Product
History
revision
2.2.1
STN (Start neutral) output added. IEC 61850 mapping is made for the added output.
2.2.1
-
2.2.2
-
2.2.3
-
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
"Preparing the IED to verify
GUID-ADA72CE6-B6ED-48B3-A897-A7B42ECDEBB4 v2
Section 11
SEMOD53560-1 v2
SEMOD172444-5 v3
SEMOD53577-1 v1
SEMOD54375-102 v10
settings".
135

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion res670

Table of Contents