Download Print this page

Sequence Of Operations - Align PTT3 Operation Manual

30,000 lbs. capacity battery powered tugger

Advertisement

PTT3 Power Tugger
7
IV. Sequence of Operations
As operator, you are responsible that no one is in harm's way whilst you are
operating the transporter.
Starting the Equipment
Turn the key switch on the handle when it is in its upright position.
Check the battery indicator to make sure the PTT3 is charged and ready for use.
Push the "lift cylinder down" button to assure that the cylinder is in its lowest position.

Advertisement

loading

Related Products for Align PTT3