Answers to frequently asked questions
Live chat with an agent
Did you enjoy building your shed?
JOIN OUR TEAM
AND MAKE UP TO $1,500/WEEK*
No selling,
just building
Bonus incentives
available
16574-SB

Advertisement

loading
Need help?

Need help?

Do you have a question about the Yardline 16574-SB and is the answer not in the manual?

Questions and answers

Summary of Contents for Backyard Yardline 16574-SB

  • Page 1 16574-SB Call Us First! DO NOT RETURN TO STORE. For questions on assembly or for general inquiries, you may contact us in the following ways: Call customer service: 1-877-743-3400 AVOID THE WAIT! visit us online at help.backyardproducts.com Submit a help request Answers to frequently asked questions Live chat with an agent Did you enjoy building your shed?
  • Page 2 (This page intentionally left blank.)
  • Page 3: Before You Begin

    16574-SB 10/16/2020 A Backyard Products Company CRESTWOOD GABLE 8' x 14' (244 x 426,7 cm) ACTUAL FLOOR SIZE IS 96 x 168" (243,8 x 426,7 cm) KEEP THIS MANUAL FOR FUTURE REFERENCE OPTION 2: OPTION 1: DOOR LOCATION DOOR LOCATION...
  • Page 4 TOOLS Required Optional Phillips ❑ Tool Belt/ ❑ Utility Knife ❑ Screwdriver Nail Pouch Shingle Blades ❑ Drill / Driver ❑ Caulk Gun ❑ 1/8" Drill Bit ❑ Tin Snips ❑ 1/4" Drill Bit ❑ (for drip edge) 5/16" Drill Bit ❑...
  • Page 5: Parts List

    PARTS IDENTIFICATION AND SIZES Part identification WOOD SIZE CONVERSION CHART letters are stamped on some parts. Nominal Board Size Actual Size 2 x 4.....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1 x 4....3/4" x 3-1/2" (1,9 x 8,9 cm) 2 x 3....1-1/2" x 2-1/2" (3,8 x 6,3 cm) Check these locations for 1 x 3....3/4"...
  • Page 6 WINDOW TRIM, DOOR TRIM & SHUTTERS 19/32 x 6-7/16 x 2" (1,5 x 16,4 x 5,1 cm) 19/32 x 6-7/16 x 5-1/2" (1,5 x 16,4 x 14 cm) 19/32 x 2-1/2 x 11" (1,5 x 6,3 x 27,9 cm) 19/32 x 2-1/2 x 30-1/8" (1,5 x 6,3 x 76,5 cm) 19/32 x 5-1/2 x 30-1/8"...
  • Page 7 WALL PANELS & DOORS NOTE: Panel parts are not stamped. 3/8 x 48 x 84" 3/8 x 23-7/8 x 84" 3/8 x 11-7/8 x 84" 3/8 x 48 x 84" 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) (1 x 60,6 x 213,4 cm) (1 x 30,2 x 213,4 cm) (1 x 121,9 x 213,4 cm)
  • Page 8 FLOOR PARTS Floor panels are 5/8" (1,6 cm) thick. NOTE: Panel parts are not stamped. 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) Look for TREATED Stamp 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm) 2 x 4 x 96"...
  • Page 9: Fasteners & Hardware

    FASTENERS & HARDWARE FASTENER/HARDWARE BAG x130 1-1/2" (3,8 cm) x335 2" (5,1 cm) x113 3" (7,6 cm) 2" (5,0 cm) NOTE: If you are using a nail gun, nails 1-5/8" (4,1 cm) may be used where screws are x100 shown for quicker assembly. 3/4"...
  • Page 10: Additional Materials

    ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed does not include any leveling materials. • See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. •...
  • Page 11 OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 8' x 14' Kit) Runners are generally 12"...
  • Page 12 CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4"...
  • Page 13: Parts Required

    FLOOR FRAME PARTS REQUIRED: 3" (7,6 cm) Look for 2 x 4 x 93" (5,1 x 10,2 x 236,2 cm) TREATED Stamp 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) BEGIN Orient parts as shown on flat surface.
  • Page 14 LEVEL AND SQUARE FLOOR FRAME Before installing floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. BEGIN See page 9 for the preferred floor leveling method. Use level and check the frame is level before applying floor panels.
  • Page 15 FLOOR PANELS PARTS REQUIRED: x219 2" (5,1 cm) 5/8 x 48 x 96" (1,6 x 121,9 x 243,8 cm) Install gable panels with the rough side facing up (painted grid lines). Ensure your foor frame is square by installing one panel and squaring frame. (2) Nails Flush BEGIN...
  • Page 16 FLOOR PANELS PARTS REQUIRED: 2" (5,1 cm) 5/8" x 23-7/8" x 96" (1,6 x 60,6 x 243,8 cm) 5/8" x 48" x 96" (1,6 x 121,9 x 243,8 cm) Next, install 48" x 96" and 23-7/8" x 96" panels. Use a chalk line or use pre-painted grid lines on panel for 2" nails spaced 6" apart on edges and 12"...
  • Page 17 IMPORTANT! Check the foor frame is level after installing foor panels. Re-level if needed. • The foor should be used as a stable work surface for wall construction. • Organize your assembly procedure during the build process HINT: to avoid over-handling of the walls. GABLE END BACK WALL WALL...
  • Page 18: Rafter Assembly

    RAFTER ASSEMBLY PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) You will build a rafter jig using the floor and (3) CPA parts as shown. ¸ BEGIN Secure (1) CPA flush to the floor deck with (2) 3" screws. Measure over 96-3/4"...
  • Page 19 RAFTER ASSEMBLY PARTS REQUIRED: x 168 x 16 2" (5,1 cm) 1-5/8" (4,1 cm) OSB OR WOOD GRAIN 6 x 24" (15,2 x 61 cm) 2 x 4 x 63-7/8" (5,1 x 10,2 x 162,2 cm) You will build 8 rafters - Six with 2 gussets and Two with only 1 gusset. ¸...
  • Page 20 GABLE DOOR WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 12-1/2" (5,1 x 10,2 x 31,8 cm) 2 x 4 x 10" (5,1 x 10,2 x 25,4 cm) 2 x 4 x 64" (5,1 x 10,2 x 162,6 cm) 2 x 4 x 80"...
  • Page 21 GABLE DOOR WALL PARTS REQUIRED: 3" (7,6 cm) Temporary support 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm) x1 LEFT + 1 RIGHT Install all panels with the primed side facing up. Place left 48"...
  • Page 22 STOP AS YOU FACE THE FRONT WALL, CHOOSE YOUR SINGLE DOOR LOCATION - LEFT OR RIGHT IMPORTANT: GABLE WALL DOUBLE DOORS FRONT WALL The single door is a reversible door and can either be left hand swing or right hand swing, If you choose to install your single door depending on your preference.
  • Page 23 FRONT WALL WITH DOOR LEFT PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) You will build two window frame assemblies (Fig.A). HINT: BEGIN For easier nailing...
  • Page 24 FRONT WALL WITH DOOR LEFT PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 20" (5,1 x 10,2 x 50,8 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 8-1/2"...
  • Page 25 FRONT WALL WITH DOOR LEFT PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) Window Frame Assembly 2 x 4 x 80"...
  • Page 26 FRONT WALL WITH DOOR LEFT PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Install all panels with the primed side facing up. BEGIN Place 48" x 84" window panel onto wall frame flush to top of frame, as shown. Use the gauge block to mark the 3/4"...
  • Page 27 FRONT WALL WITH DOOR LEFT PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Place 48 x 84" single door panel onto wall frame flush to top of frame, as shown. Use the gauge block to mark the 3/4"...
  • Page 28 FRONT WALL WITH DOOR LEFT PARTS REQUIRED: 3" (7,6 cm) x127 3/8 x 11-7/8 x 84" 2" (5,1 cm) (1 x 30,2 x 213,4 cm) ATA Temporary Support 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 2 x 4 x 64-1/8" (5,1 x 10,2 x 162,9 cm) Place 2nd 48"...
  • Page 29 FRONT WALL WITH DOOR RIGHT PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) You will build two window frame assemblies (Fig.A). HINT: For easier nailing BEGIN...
  • Page 30 FRONT WALL WITH DOOR RIGHT PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 20" (5,1 x 10,2 x 50,8 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 8-1/2"...
  • Page 31 FRONT WALL WITH DOOR RIGHT PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 8-1/2" (5,1 x 10,2 x 21,6 cm) 2 x 4 x 35" (5,1 x 10,2 x 88,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) Window Frame Assembly 2 x 4 x 80"...
  • Page 32 FRONT WALL WITH DOOR RIGHT PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Install all panels with the primed side facing up. BEGIN Place 48" x 84" window panel onto wall frame flush to top of frame, as shown. Use the gauge block to mark the 3/4"...
  • Page 33 FRONT WALL WITH DOOR RIGHT PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) Place 48 x 84" single door panel onto wall frame flush to top of frame, as shown. Use the gauge block to mark the 3/4"...
  • Page 34 EAVE SIDE WALL WITH DOOR RIGHT PARTS REQUIRED: x127 2" (5,1 cm) 3/8 x 11-7/8 x 84" (1 x 30,2 x 213,4 cm) ATA Temporary Support 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm) 2 x 4 x 64-1/8" (5,1 x 10,2 x 162,9 cm) Place 2nd 48"...
  • Page 35 BACK WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 72" (5,1 x 10,2 x 182,9 cm) 2 x 4 x 80" (5,1 x 10,2 x 203,2 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) HINT: BEGIN For easier nailing...
  • Page 36 BACK WALL PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 48 x 84" (121,9 x 213,4 cm) Install all panels with the primed side facing up. Ensure your wall frame is square by installing one panel and squaring frame. Place 1st 48 x 84" panel onto wall frame flush to top of frame, as shown. Use the gauge block to mark the 3/4"...
  • Page 37 BACK WALL PARTS REQUIRED: x136 2" (5,1 cm) 3/4" GAUGE 48 x 84" 23-7/8 x 84" BLOCK (121,9 x 213,4 cm) (60,6 x 213,4 cm) Place 2nd 48" x 84" panel on frame, For squareness maintain fush and 3/4" as shown. measurement along panel edges.
  • Page 38 GABLE END WALL PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 80" (5 x 10,2 x 203,2 cm) 2 x 4 x 89" (5 x 10,2 x 226,1 cm) Temporary support Temporary support 19/32 x 5-1/2 x 30-1/8" 2 x 4 x 6" (1,5 x 14 x 76,5 cm) (5,1 x 10,2 x 15,2 cm) BEGIN...
  • Page 39 GABLE END WALL PARTS REQUIRED: 1-1/2" (3,8 cm) 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm) Install all panels with the primed side facing up. Place 48 x 84" panel on frame flush at top and with a 1-3/4" gap along right side. Maintain 1-3/4"...
  • Page 40 GABLE END WALL PARTS REQUIRED: 1-1/2" (3,8 cm) 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm) Place right 48 x 84" panel flush to left panel. 2" (5,1 cm) Secure with 2" nails spaced 6" apart on edges. Nails Secure panel to TK with 1-1/2"...
  • Page 41: Front Wall

    FRONT WALL PARTS REQUIRED 3" (7,6 cm) Temporary Support 1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) 3" (7,6 cm) 2" (5,1 cm) BEGIN Center wall on the 168" (426,7 cm) floor dimension. Use OO as a temporary brace. Secure with (2) 3" screws. 3"...
  • Page 42 GABLE END WALL PARTS REQUIRED: 1-1/2" (3,8 cm) 3" (7,6 cm) 2" (5,1 cm) 2" (5,1 cm) 3" (7,6 cm) 2" (3,8 cm) Flush Screw Flush STEP FIRST BEGIN SCREW Fig. A Set gable end wall on floor and secure top of wall 2"...
  • Page 43 BACK WALL PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN Center back wall on the 168" (426,7 cm) floor dimension. Secure top of wall with (1) 2" screw into top plate (Fig A). BE SURE TOP OF WALL FRAMES ARE FLUSH. Fig.
  • Page 44 BACK WALL PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) Nail lower edge of back wall panels to floor frame with 2" nails spaced 6" apart. Angle nail to hit floor frame (Fig. D). Secure back wall bottom plates to floor with 3" nails (Fig. D). Remove temporary supports.
  • Page 45 GABLE DOOR WALL PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) BEGIN Set gable door wall on floor and secure with (1) 2" screw (Fig A). ENSURE TOP WALL FRAMES ARE FLUSH. Flush 2"...
  • Page 46 GABLE DOOR WALL PARTS REQUIRED: Nail lower edge of panels to floor with 2" nails spaced 6" apart. Angle nail to hit floor frame (Fig. C). 2" (5,1 cm) Nails 6" (15,2 cm) Angle nail to hit foor frame. 6" (15,2 cm) Fig.
  • Page 47 GABLE UNITS PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 6" (5,1 x 10,2 x 15,2 cm) 2 x 4 x 10" (5,1 x 10,2 x 25,4 cm) TEMPORARY SUPPORT 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) Install all panels with the primed side facing up.
  • Page 48 GABLE UNITS PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) x2 Gable Units BEGIN Install both gable units the same on both gable walls. Measure 2-9/16" down from top plate and mark at each side as shown (Fig A). Set gable unit on top plate SZ. BE SURE GABLE UNIT IS CENTERED ON WALL BEFORE NAILING. Hold gable unit secure with (1) 2"...
  • Page 49 LOFT PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) 3" (7,6 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) If your front wall has door to LEFT side, see Fig. A. If your front wall has door to RIGHT side, see next page.
  • Page 50 LOFT PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) 3" (7,6 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Measure and mark gable wall corner studs 1/2" down from top plates (Fig. B). Place and hold top of PT on 1/2"...
  • Page 51 LOFT PARTS REQUIRED: 2" (5,1 cm) 7/16 x 26-5/8 x 89" (1,1 x 67,6 x 226,1 cm) Place 7/16" x 26-5/8" x 89" loft panel centered on loft supports. Slide panel into gap at gable wall (Fig. D). Secure to loft frame with 2" nails evenly spaced. Fig.
  • Page 52 SHELVES PARTS REQUIRED: 3" (7,6 cm) 2 x 3 x 21-3/4" (5,1 x 7,6 x 55,2 cm) 3" (7,6 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) BEGIN Measure and mark location for AED (Fig. A, Fig. B). Place loft support ledger boards AED between gable wall and eave wall stud with narrow side to wall panel (Fig.
  • Page 53 SHELVES PARTS REQUIRED: 3" (7,6 cm) 2" (5 cm) 7/16 x 10-1/2 x 89" (1,1 x 26,7 x 226,1 cm) 2 x 3 x 96" (5,1 x 7,6 x 243,8 cm) Measure and mark both AED's at the measurements shown from gable wall studs. Mark front wall stud at the dimensions shown Secure PT's with 3"...
  • Page 54 RAFTERS PARTS REQUIRED: 3" (7,6 cm) Pre-Assembled Rafter Pre-Assembled Rafter with 2 gussets with 1 gusset ¸ BEGIN Locate first 2 gusset rafter on top plate, aligned over studs at each side and tight to side wall (Fig. A, Fig. B). Secure rafter to top plate with (2) 3"...
  • Page 55 ROOF PANELS PARTS REQUIRED: x174 2" (5,1 cm) 3/4" GAUGE 7/16 x 15-7/8 x 23-7/8" BLOCK (1,1 x 40,3 x 60,6 cm) 7/16 x 48 x 96" 7/16 x 48 x 71-7/8" 7/16 x 15-7/8 x 48" (1,1 x 121,9 x 243,8 cm) (1,1 x 121,9 x 182,6 cm) (1,1 x 40,3 x 121,9 cm) 7/16 x 15-7/8 x 96"...
  • Page 56 ROOF PANELS PARTS REQUIRED: Install a 15-7/8" x 23-7/8" panel flush with the installed 15-7/8" x 96" panel (Fig A). The panel is flush at the gable end overhang (Fig. B), and the panel is 1/2" from outside of the end rafter (Fig. C). Secure panel with (2) 2"...
  • Page 57 ROOF PANELS PARTS REQUIRED: Place a 48" x 96" upper roof panel flush to lower panels. Ensure 1/2" gap at gable end rafter (Fig. B) and 3/4" measurement on the rafter (Fig. A). Secure the lower edge of roof panel with (2) 2" nails in corners, 3/4"...
  • Page 58 ROOF PANELS PARTS REQUIRED: Secure all roof panels with 2" nails spaced 6" apart on edges and 12" apart inside panel. 6" (15,2 cm) 12" (30,5 cm) Repeat process to install roof panels on the opposite side. FINISH Your roof panels are now installed.
  • Page 59 GABLE TRIM PARTS REQUIRED: 1-1/2" (3,8 cm) 2 x 4 x 64-1/8" (5,1 x 10,2 x 162,9 cm) LEFT 3/8 x 4-3/4 x 64-1/8" (1 x 12,1 x 162,9 cm) RIGHT 3/8 x 4-3/4 x 64-1/8" (1 x 12,1 x 162,9 cm) You will build two LEFT and two RIGHT gable trim units.
  • Page 60 GABLE TRIM PARTS REQUIRED: 3" (7,6 cm) RIGHT gable trim unit LEFT gable trim unit BEGIN Line up RIGHT gable trim unit flush to gable panel center seam and flush with roof sheathing (Fig. A, Fig. B). Secure with 3" screws into end rafter and spaced evenly (approximately 24" (61 cm). Flush Fig.
  • Page 61 GABLE TRIM PARTS REQUIRED: 2" (5,1 cm) Keystone 3/8 x 4-3/4 x 54-5/8" (1 x 12,1 x 138,7 cm) 3/8 x 10 x 17" (1 x 25,4 x 43,2 cm) BEGIN Line up (10" x 17") Keystone flush to gable unit peak and flush with roof sheathing (Fig. A). Secure with 2"...
  • Page 62 EAVE SIDE SOFFITS PARTS REQUIRED: 2 x 4 x 22-1/2" (5,1 x 10,2 x 57,1 cm) 2" (5,1 cm) 3/8 x 4-7/8 x 73-1/2" (1 x 12,4 x 186,7 cm) 3" (7,6 cm) 3/8 x 4-7/8 x 96" (1 x 12,4 x 243,8 cm) Ensure soffit boards are fush at rafter ends (Fig.
  • Page 63 EAVE SIDE SOFFITS PARTS REQUIRED: Place 96" soffit board primed side down, flush to gable trim unit and rafter ends (Fig B). Secure with 2" finish nails, (2) in each rafter and (2) into edge of AO as shown. Position 73-1/2" soffit board primed side down flush to gable trim unit and rafter ends (Fig B). Secure with 2"...
  • Page 64 EAVE SIDE FASCIA PARTS REQUIRED: 2" (5,1 cm) 3/8 x 4-3/4 x 77-1/4" (1 x 12,1 x 196,2 cm) 3/8 x 4-3/4 x 96" (1 x 12,1 x 243,8 cm) BEGIN Place 77-1/4" soffit board primed side down, flush to gable trim unit and roof sheathing (Fig A). Secure with 2"...
  • Page 65 DOUBLE DOORS - GABLE WALL PARTS REQUIRED: IMPORTANT! 3" (7,6 cm) USE DOORS WITH HINGE BOARD ENDS PAINTED GREEN AND RED 1-5/8" (4,1 cm) HINT: x1 GAA Look for 3/8" SPACER 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) attached to doors.
  • Page 66 DOUBLE DOORS - GABLE WALL PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener Install temporary support OO as a ledger board flush under wall panels for doors to rest on. Secure with (2) 3" screws (Fig. A) . Center doors on panel seam as shown (Fig.
  • Page 67 DOUBLE DOORS - GABLE WALL PARTS REQUIRED: 3/4" (1,9 cm) 19/32 x 2-1/2 x 70-7/8" (1,5 x 6,3 x 180 cm) 19/32 x 2-1/2 x 70-7/8" (1,5 x 6,3 x 180 cm) BEGIN Secure door trim from inside with 3/4" screws, as shown (Fig. A). Install DGL and DGR with 3/4"...
  • Page 68 DOUBLE DOOR STIFFENERS - GABLE WALL PARTS REQUIRED: 2" (5,1 cm) 69" (175,3 cm) Door Stiffener BEGIN Center OO vertically on the left door in the door opening flush with the edge of door (Fig. A). Secure with (6) 2" screws through outside trim into OO (Fig. B) Repeat to install door stiffener OO on right door.
  • Page 69 DOUBLE DOOR HARDWARE PARTS REQUIRED: 1-1/2" (3,8 cm) 4-1/2" Shaft 1/4" (0,6 cm) 1/2" (1,3 cm) Drill Bits BEGIN Measure and mark location of hole on outside of right door as shown (Fig. A). Pre-drill pilot hole with 1/4" dril. Pre-drill through hole with 1/2"...
  • Page 70 DOUBLE DOOR HARDWARE PARTS REQUIRED: 1-1/4 (3,2 cm) 3/8" BIT (9,5 mm) ¸ BEGIN Flush and center top spring bolt at the top of OO (Fig. A). Secure with (4) 1-1/4" screws. Mark spring bolt pin location on over door frame. Drill a 1-1/2" deep hole using a 3/8" drill bit. Flush and center bottom spring bolt to bottom of OO (Fig.
  • Page 71 SINGLE DOOR - FRONT WALL PARTS REQUIRED: 3" (7,6 cm) Painted UNIVERSAL DOOR Black Left on Ends Refer to Page 20 for right hand swing single door note. BEGIN Install single door with black-painted hinge board. Center door in wall panel opening. Hold door in position and keep level.
  • Page 72 SINGLE DOOR TRIM - FRONT WALL PARTS REQUIRED: 3/4" (1,9 cm) 19/32 x 2-1/2 x 70-7/8" (1,5 x 6,3 x 180 cm) BEGIN Secure door trim from inside with 3/4" screws as shown (Fig. A). Install DGL with 3/4" screws from inside of door. (Fig. B). Reinforce the door trim with 3/4"...
  • Page 73 DOOR STIFFENER & WEATHER STRIP - FRONT WALL PARTS REQUIRED: 2" (5,1 cm) 69" (175,3 cm) Door Stiffener 2" (5,1 cm) 1 x 4 x 69-3/4" (2,5 x 10,2 x 177,2 cm) BEGIN Center OO vertically on door in the door opening (Fig. A) 1" from edge of door (Fig. B). Secure with (6) 2"...
  • Page 74 DOOR HARDWARE - SINGLE DOOR PARTS REQUIRED: 1-1/2" (3,8 cm) 5-1/2" Shaft 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN Measure and mark location of hole on outside of door as shown (Fig.A). Pre-drill pilot hole with 1/4" dril. Pre-drill through hole with 1/2"...
  • Page 75 CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8 x 1-3/4 x 81-1/2" (1 x 4,4 x 207 cm) ¸ BEGIN Install (1) 81-1/2" trim board flush under soffit panel and against eave wall (Fig. A, B) with (1) 2" finish nail at top as shown. Position 81-1/2"...
  • Page 76 COLLAR TIES PARTS REQUIRED: 2" (5,1 cm) 1 x 4 x 60" (2,5 x 10,2 x 152,4 cm) BEGIN Position and level collar ties JF on 3rd and 5th rafters from double door wall. HINT: For best appearance install collar ties on rafters facing away from double door opening. Secure with (3) 2"...
  • Page 77 WINDOWS PARTS REQUIRED: Window 1-5/8" (4,1 cm) 22-1/4 x 29-3/4" (56,5 x 75,6 cm) BEGIN Seal windows with high-quality exterior-grade caulk before installing (Fig. A). Center and secure windows with 1-5/8" screws as shown. Ensure window is level. Fig. A Fig.
  • Page 78 SHUTTERS & WINDOW TRIM PARTS REQUIRED: 2" (5 cm) 1" (2,5 cm) 19/32 x 2-1/2 x 11" (1,5 x 6,3 x 27,9 cm) 19/32 x 2-1/2 x 30-1/8" (1,5 x 6,3 x 76,5 cm) 19/32 x 5-1/2 x 30-1/8" (1,5 x 14 x 76,5 cm) BEGIN Position DHA on top of DJA primed side down as shown.
  • Page 79 WINDOW TRIM (cont.) PARTS REQUIRED: 2" (5 cm) 19/32 x 6-7/16 x 5-1/2" (1,5 x 17,5 x 14 cm) 19/32 x 6-7/16 x 2" (1,5 x 16,4 x 5,1 cm) 19/32 x 2-1/2 x 53" (5,1 x 6,3 x 134,6 cm) 19/32 x 3-1/2 x 55"...
  • Page 80 DOOR TRIM PARTS REQUIRED: 2" (5 cm) 19/32 x 6-7/16 x 5-1/2" (1,5 x 17,5 x 14 cm) 19/32 x 6-7/16 x 2" (1,5 x 16,4 x 5,1 cm) 19/32 x 3-1/2 x 40" (1,5 x 8,9 x 101,6 cm) 19/32 x 3-1/2 x 72"...
  • Page 81 DOOR TRIM PARTS REQUIRED: 2" (5 cm) 19/32 x 6-7/16 x 5-1/2" (1,5 x 17,5 x 14 cm) 19/32 x 6-7/16 x 2" (1,5 x 16,4 x 5,1 cm) 19/32 x 3-1/2 x 40" (1,5 x 8,9 x 101,6 cm) 19/32 x 2-1/2 x 72"...
  • Page 82 DOOR - DECORATIVE HINGES PARTS REQUIRED: 1" (2,5 cm) BEGIN Level decorative hinges in position as shown. Secure with 1" (2,5 cm) screws. 1" (2,5 cm) 1" (2,5 cm) Screws Screws Flush Flush FINISH You have finished installing your decorative door hinges.
  • Page 83 GABLE VENTS PARTS REQUIRED: 2" (5 cm) Vent with Frame #15021 ¸ BEGIN Place vent in gable opening. Seal vent behind vent flange edges with high-quality exterior-grade caulk before installing (Fig. A). Fig. A Center vent frame over vent. Ensure frame is level. Seal vent trim from behind with high-quality exterior-grade caulk before installing (Fig.
  • Page 84 PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
  • Page 85 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2 " 1" Sealing Str 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
  • Page 86 SHINGLES continued... Beginning at front of shed, install first row of shingles with notch at 1" past roof edge or flush with drip edge. Roof Deck FRONT OF BACK OF SHED SHED 1" (2,5 cm) Flush with starter row. Notch - or - Drip Edge Flush with starter row.
  • Page 87 SHINGLES continued... Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5"...
  • Page 88 SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5 cm) (5 cm 2" 2" 2"...
  • Page 89 SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. 4" (10 cm) Trim cap off fush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
  • Page 90 Storage Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;...