Download Print this page

Backyard GAMBREL Assembly Manual

10' x 12' (304,8 x 365,8 cm)

Advertisement

Quick Links

STOP!
STOP!
DO NOT RETURN TO STORE.
For immediate help with assembly or product information
call our toll free number:
customerservice@backyardproductsllc.com
Our staff is ready to provide assistance
April through October M-F 8:00 AM to 7:00 PM EST
Saturday 8:30 AM to 4:30 PM EST
November through March M - F 8:00 AM to 5:00 PM EST
Call Us First!
1-888-827-9056
or email:
16460

Advertisement

loading
Need help?

Need help?

Do you have a question about the GAMBREL and is the answer not in the manual?

Questions and answers

Summary of Contents for Backyard GAMBREL

  • Page 1 16460 STOP! STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-888-827-9056 or email: customerservice@backyardproductsllc.com Our staff is ready to provide assistance April through October M-F 8:00 AM to 7:00 PM EST Saturday 8:30 AM to 4:30 PM EST November through March M - F 8:00 AM to 5:00 PM EST...
  • Page 2 (This page intentionally left blank.)
  • Page 3: Assembly Manual

    16460 01-05-2021 ASSEMBLY MANUAL GAMBREL 10' x 12' (304,8 x 365,8 cm) BUILDING SIZE ACTUAL FLOOR SIZE 10' x 12' (365,8 x 365,8 cm) BASE MODEL 10' x 12' (304,8 x 365,8 cm) 10' x 16' (365,8 x 487,7 cm)
  • Page 4 TOOLS Required Optional ❑ Phillips ❑ Tool Belt/ ❑ Utility Knife Screwdriver Nail Pouch ❑ Shingle Blades ❑ Drill / Driver ❑ Tin Snips ❑ 3/8" Drill Bit ❑ Caulk Gun (for drip edge) ❑ #2 Philips Drive Bit ❑ Chalk Line ❑...
  • Page 5: Additional Materials

    ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed does not include any floor or leveling materials. • See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to properly level your floor, as this will vary depending on your specific site. REINFORCED WOOD FLOOR FRAME (OPTIONAL) IMPORTANT! Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists (shown below as shaded).
  • Page 6: Optional Materials

    ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials: 10x12' 10x16' ALL SIZES 3-TAB SHINGLES (Bundles)....PAINT FOR TRIM ......1 Quart Use 100% acrylic latex exterior paint. PAINT FOR SIDING (Gallons)....CAULK ...10x12 - 3 Tubes ...10x16 - 4 Tubes Use 100% acrylic latex exterior paint.
  • Page 7 2 x 3 ....1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1 x 3 ....3/4" x 2-1/2" (3,8 x 6,3 cm) 10x12' GAMBREL 10' x 12' PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.
  • Page 8 PANEL & DOORS PARTS LIST NOTE: Panel parts are not stamped with part identification. SQUARE SQUARE SQUARE EDGE EDGE EDGE LIP EDGE Left Right 3/8 x 48 x 84" 3/8 x 23-7/8 x 84" (1 x 121,9 x 213,4 cm) (1 x 121,9 x 213,4 cm) 3/8"...
  • Page 9: Door Hardware

    DOOR TRIM 19/32" x 2-1/2" x 26-5/8" (1,5 x 6,3 x 67,7 cm) 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) 69" (175,3 cm) Door Stiffener 19/32"...
  • Page 10 1 x 3 ....3/4" x 2-1/2" (3,8 x 6,3 cm) • Check these locations for part stamp. 10x4' GAMBREL 10' x 4' EXTENDER KIT PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in.
  • Page 11 CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundaton as shown, and continue on to page 14. Treated Sill Plate Caulk between sill plate and concrete.
  • Page 12 OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS (Typical for 10' x 12' Kit) Runners are generally 12"...
  • Page 13 LEVELING & SQUARING THE FLOOR FRAME (Not Included) LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking, it is important to level and square the floor frame. A level and square floor frame is required to correctly construct your shed. See page 10 for the preferred floor leveling method.
  • Page 14 IMPORTANT! I M P O R T A N T ! NOTE: 10' x 12' Gambrel shown standard throughout manual Ensure the floor frame is level after installing floor panels. Re-level if needed. • The floor should used as a stable work surface for wall construction.
  • Page 15 (This page intentionally left blank.)
  • Page 16 WALL CONFIGURATION GUIDE Create your own style of shed. Choose your door location. Compare this guide with the wall index to find the corresponding pages. 10' x 12' 10' x 16' Streamline your wall assembly process by cutting out the pages for the wall configuration guide and the wall index.
  • Page 17 WALL INDEX 10' x 12' After assembling the walls for your 10' x 12' shed, go to page 42 for wall installation. 10' x 12' Door is on the 10' wall. Wall 01: Page 18 Wall 02: Page 20 Wall 04: Page 24 Wall 05: Page 26 10' x 12' V-1 Door is on the 12' wall, centered.
  • Page 18 DOOR HEADER Assemble this door header before building any walls! Any wall with a door will require this assembly. PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 67" (5,1 x 10,2 x 170,2 cm) 7/16 x 3-1/4 x 66-3/4" (1,1 x 8,3 x 170,2 cm) BEGIN Place (1) AM and OSB end-to-end on flat surface, flush in middle.
  • Page 19 WALL PANEL INSTALLATION HINTS & EXAMPLES PARTS REQUIRED: 2" (5,1 cm) 2x3" TEMP. SPACER 3/4" GAUGE BLOCK 3/8 x 48 x 84" (1 x 121,9 x 213,4 cm ) Ensure your wall is square by installing one panel and squaring frame. Install all wall panels with the primed side facing up.
  • Page 20 Refer to the WALL CONFIGURATION GUIDE and WALL INDEX at this time. 10' WALL - 01 PARTS REQUIRED: 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) x2 SL 2 x 4 x 36" (5,1 x 10,2 x 91,4 cm) 3"...
  • Page 21 10' WALL 01 PARTS REQUIRED: 3" (7,6 cm) x150 2" (5,1 cm) 11-7/8" x 84" (30,2 x 213,4 cm) Temporary Brace 69" (75,3 cm) Door Stiffener Install the left panel 1-1/2" 1-1/2" from the top plate. Flush (3,8 cm) 3/4" BEGIN HERE Use a 2x3 spacer for (1,9 cm)
  • Page 22 10' WALL 02 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 24" (5,1 x 10,2 x 61 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,8 cm) BEGIN Orient parts on edge on floor as shown.
  • Page 23 10' WALL 02 PARTS REQUIRED: x136 2" (5,1 cm) 48 x 84" 23-7/8" x 84" (121,9 x 213,4 cm ) (60,6 x 213,4 cm ) 1-1/2" (3,8 cm) 3/4" BEGIN HERE Install 48" x 84" panel 1-1/2" (1,9 cm) from the top plate. Use a 2x3 spacer for consistent measurement.
  • Page 24 10' WALL 03 PARTS REQUIRED: 3" (7,6 cm) x2 SL 2 x 4 x 36" (5,1 x 10,2 x 91,4 cm) 2 x 4 x 78-1/2" (5,1 x 10,2 x 199,4 cm) 2 x 4 x 84" (5,1 x 10,2 x 213,4 cm) BEGIN Orient parts on edge on floor as shown.
  • Page 25 10' WALL 03 PARTS REQUIRED: x164 2" (5,1 cm) (x1 Left & x1 Right) 48 x 84" (121,9 x 213,4 cm ) 11-7/8" x 84" (30,2 x 213,4 cm) 3/4" Install 48" x 84" panel BEGIN HERE 1-1/2" (1,9 cm) (3,8 cm) 1-1/2"...
  • Page 26 12' WALL 04 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2"...
  • Page 27 12' WALL 04 PARTS REQUIRED: x120 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm ) 3/4" BEGIN HERE 3-1/2" (1,9 cm) Install 48" x 84" panel (8,9 cm) 1-1/2" from the top plate. 1-1/2" (3,8 cm) Use a 2x3 spacer for consistent measurement.
  • Page 28 12' WALL - 05 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235,3 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2"...
  • Page 29 12' WALL 05 PARTS REQUIRED: x142 2" (5,1 cm) 48 x 84" 23-7/8" x 84" (121,9 x 213,4 cm ) (60,6 x 213,4 cm ) 3/4" BEGIN HERE (1,9 cm) 1-1/2" Install 48" x 84" panel (3,8 cm) 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement.
  • Page 30 12' WALL 06 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 78-1/2"...
  • Page 31 12' WALL 06 PARTS REQUIRED: 3" (7,6 cm) x132 2" (5,1 cm) 23-7/8" x 84" Temporary Brace (60,6 x 213,4 cm ) 69" (75,3 cm) Door Stiffener Flush 3/4" BEGIN HERE (1,9 cm) Install the left panel 1-1/2" from the top plate. Use a 2x3 spacer for consistent measurement.
  • Page 32 12' WALL 07 PARTS REQUIRED: 2 x 4 x 7" (5,1 x 10,2 x 17,8 cm) 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 78-1/2"...
  • Page 33 12' WALL 07 PARTS REQUIRED: 3" (7,6 cm) x112 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 48 x 84" (121,9 x 213,4 cm ) 3-1/2" 1-1/2" (8,9 cm) Install the left panel 1-1/2" Flush (3,8 cm) 3/4" BEGIN HERE from the top plate.
  • Page 34 16' WALL 08 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2"...
  • Page 35 16' WALL 08 PARTS REQUIRED: x170 2" (5,1 cm) 48 x 84" (121,9 x 213,4 cm ) Install 48" x 84" panel 1-1/2" from the top plate. 3/4" BEGIN HERE (1,9 cm) 1-1/2" Use a 2x3 spacer (3,8 cm) for consistent measurement.
  • Page 36 16' WALL 09 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 68-1/2" (5,1 x 10,2 x 174 cm) 2 x 4 x 78-1/2"...
  • Page 37 16' WALL 09 PARTS REQUIRED: x192 2" (5,1 cm) 23-7/8" x 84" (60,6 x 213,4 cm ) 48 x 84" (121,9 x 213,4 cm ) Install 48" x 84" panel 1-1/2" 1-1/2" from the top plate. 3/4" (3,8 cm) BEGIN HERE (1,9 cm) Use a 2x3 spacer for consistent...
  • Page 38 16' WALL 10 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 68-1/2"...
  • Page 39 16' WALL 10 PARTS REQUIRED: 3" (7,6 cm) x160 2" (5,1 cm) Temporary Brace 69" (75,3 cm) Door Stiffener 48 x 84" (121,9 x 213,4 cm ) 1-1/2" Flush (3,8 cm) Install the left panel 1-1/2" 3/4" BEGIN HERE (1,9 cm) from the top plate.
  • Page 40 16' WALL 11 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 68-1/2"...
  • Page 41 16' WALL 11 PARTS REQUIRED: 3" (7,6 cm) x182 23-7/8" x 84" 2" (5,1 cm) (60,6 x 213,4 cm ) Temporary Brace 48 x 84" (121,9 x 213,4 cm ) 69" (75,3 cm) Door Stiffener 1-1/2" Install the left panel 1-1/2" Flush (3,8 cm) 3/4"...
  • Page 42 16' WALL 12 PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 44-3/8" (5,1 x 10,2 x 112,7 cm) 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 3" (7,6 cm) 2 x 4 x 68" (5,1 x 10,2 x 172,7 cm) 2 x 4 x 68-1/2"...
  • Page 43 16' WALL 12 PARTS REQUIRED: 3" (7,6 cm) x163 2" (5,1 cm) Temporary Brace 48 x 84" (121,9 x 213,4 cm ) 69" (75,3 cm) Door Stiffener 3-1/2" 1-1/2" Install the left panel Flush (8,9 cm) (3,8 cm) 3/4" 1-1/2" from the top plate. BEGIN HERE (1,9 cm) Use a 2x3 spacer...
  • Page 44 STANDING YOUR WALLS The following steps show how to stand and secure your walls for a 10' x 12' shed. These instructions are by default with the door on the 10' gable wall. For 10' x 16' steps, start on page 48. STANDARD: DOOR LOCATED ON 10' GABLE WALL...
  • Page 45 10' WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) BEGIN 1-1/2" (3,8 cm) Center 10' wall on the 120" (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. Use OO as a temporary brace.
  • Page 46 12' WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 1-1/2" (3,8 cm) 3" (7,6 cm) Fig. B BEGIN Place 12' wall centered on floor. 1-1/2" (3,8 cm) overlap is to the top. 2" (5,1 cm) Secure wall with (1) 2"...
  • Page 47 12' WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) 1-1/2" BEGIN Fig. B (3,8 cm) Remove temporary brace OO from installed 10' wall. Place 12' wall centered on floor. 2"...
  • Page 48 10' WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Fig. B BEGIN 2" (5,1 cm) Place 10' wall on floor centered between 12' walls. Screw Secure wall with 2" screws into top and bottom plates (Fig.
  • Page 49 10' x 12' WALL DOUBLERS INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x2 JBD 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2 x 4 x 96"...
  • Page 50 10' WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 69" (175,3 cm) Door Stiffener 3" (7,6 cm) 2" (5,1 cm) BEGIN 1-1/2" Center 10' wall on the 120" (3,8 cm) (304,8 cm) floor dimension. 1-1/2" (3,8 cm) overlap is to the top. 3"...
  • Page 51 16' WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 1-1/2" (3,8 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2" (5,1 cm) 3" (7,6 cm) Fig. B BEGIN Place 16' wall centered on floor. 2"...
  • Page 52 16' WALL INSTALLATION PARTS REQUIRED: 2" (5,1 cm) 3" (7,6 cm) Temporary Brace 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) BEGIN 1-1/2" (3,8 cm) Remove temporary brace OO from installed 10' wall. 3" (7,6 cm) Place 16' wall centered on floor. Screws 1-1/2"...
  • Page 53 16' WALL INSTALLATION PARTS REQUIRED: 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Nail lower edge of wall panels to floor frame with 2" nails spaced 6" apart. Angle nails into floor frame (Fig. C). 3" (7,6 cm) Secure wall bottom plates to floor Nails with 3"...
  • Page 54 10' WALL INSTALLATION PARTS REQUIRED 2" (5,1 cm) 3" (7,6 cm) 2" (5,1 cm) 3" (7,6 cm) 1-1/2" (3,8 cm) Fig. B BEGIN 2" (5,1 cm) Place 10' wall on floor centered between 16' walls. Screw Secure wall with 2" screws into top and bottom plates (Fig.
  • Page 55 10' x 16' WALL DOUBLERS INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x2 JBD 2 x 4 x 48" (5,1 x 10,2 x 121,9 cm) 2 x 4 x 20-3/8" (5,1 x 10,2 x 51,8 cm) 3" (7,6 cm) 2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm) 2 x 4 x 96"...
  • Page 56 RAFTERS 10x12' 10x16' PARTS REQUIRED: 3" (7,6 cm) 6 x 24" (15,2 x 60,9 cm) x1 RL Temporary Support 2 x 4 x 24" (5,1 x 10,2 x 61 cm) Pre-assembled x144 x192 2" (5,1 cm) Build (2) rafter assemblies with(1) gusset (Fig. B). BEGIN HINT: Measure 120-11/16 (306,5 cm) from the corner and install RL with (2) 3"...
  • Page 57 10x12' 10x16' RAFTER INSTALLATION PARTS REQUIRED: Two-Gusset Preassembled One-Gusset Preassembled 3" (7,6 cm) BEGIN Align rafters over the wall studs. Check that you have the measurements shown. Secure rafters with (2) 3" screws angled at each end (Fig. A, Fig. B). Secure rafters on opposite side.
  • Page 58 GABLE HAY LOFT TRIM PARTS REQUIRED: 2" (5,1 cm) 3/4" (1,9 cm) 19/32" x 2-1/2" x 12-7/8" (1,6 x 7,6 x 32,7 cm) 19/32" x 2-1/2" X 21-3/4" (1,6 x 7,6 x 55,2 cm) x2 QL Temporary Support x1 LKA 2 x 4 x 39"...
  • Page 59 GABLE PANELS PARTS REQUIRED: 1-1/2" (3,8cm) x4 QL 2 x 4 x 39" (5,1 x 10,2 x 99,1 cm) Install gable panels with the primed side facing up. BEGIN BEGIN Orient parts QL on the flat side, as shown. Measure and mark the center of the middle gable panel. Secure with 1-1/2" nails spaced 6" apart along edge. Place end panels on QL flush to installed panel and secure with 1-1/2"...
  • Page 60 GABLE INSTALLATION PARTS REQUIRED: 3" (7,6 cm) x114 2" (5,1 cm) Pre - assembled BEGIN Measure 2-9/16" down from top plate doubler and mark at each side as shown. Set gable unit on top plate. Fasten with (1) 2" nail on each side. BE SURE GABLE IS CENTERED ON WALL BEFORE NAILING.
  • Page 61 10' x 12' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 48 x 96" (121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN Place the 48"...
  • Page 62 10' x 12' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 47-7/8 x 48" (121,6 x 121,9 cm) Install a 48" x 47-7/8" roof panel flush to the Flush at installed panel and flush at peak (Fig. B). peak Fig. B Secure panel with (1) 2"...
  • Page 63 10' x 12' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 23-7/8" x 47-7/8" 11-7/8" x 96" (30,2 x 243,8 cm) (60,6 x 121,9 cm) 3/4" GAUGE BLOCK 23-7/8" x 96" 11-7/8" x 47-7/8" (60,6 x 243,8 cm) (59,7 x 121,9 cm) Next, install 23-7/8"...
  • Page 64 10' x 12' ROOF PANELS PARTS REQUIRED: x178 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart on edges and 12" apart inside panels. 6" (15,2 cm) Repeat all STEPS to install roof panels on the opposite side. FINISH Your roof panels are now installed.
  • Page 65 10' x 16' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE BLOCK 48 x 96" (121,9 x 243,8 cm) Roof panels may cause serious injury until securely fastened. Note: Install all roof panels with the rough side up (painted grid lines). BEGIN Place the 48"...
  • Page 66 10' x 16' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 47-7/8 x 48" (121,6 x 121,9 cm) Flush at peak 1/2" Install first 47-7/8" x 48" roof (1,2 cm) Fig. B panel flush to the installed panel and flush at the peak (Fig. B). Fig.
  • Page 67 10' x 16' ROOF PANELS PARTS REQUIRED: 2" (5,1 cm) 3/4" GAUGE 23-7/8" x 96" 23-7/8" x 48" BLOCK (60,6 x 243,8 cm) (60,6 x 121,9 cm) 11-7/8" x 96" 11-7/8" x 48" (30,2 cm x 243,8 cm) (30,2 cm x 121,9 cm) Install 23-7/8"...
  • Page 68 10' x 12' ROOF PANELS PARTS REQUIRED: x258 2" (5,1 cm) Secure all roof panels with 2" nails spaced 6" apart on edges and 12" apart inside panels. 6" (15,2 cm) Repeat STEPS to install roof panels on the opposite side. FINISH Your roof panels are now installed.
  • Page 69 GABLE TRIM PARTS REQUIRED: 2" (5,1 cm) 5/8 x 4 x 48-5/16 5/8 x 4 x 36" (1,6 x 10 x 123 cm) (1,6 x 10 x 91 cm) 5/8 x 4 x 48-5/16 5/8 x 4 x 36" (1,6 x 10 x 123 cm) (1,6 x 10 x 91 cm) BEGIN Install upper gable trim ZQR and ZQL flush to top of roof panels and flush at peak.
  • Page 70 CORNER TRIM PARTS REQUIRED: 2" (5,1 cm) 3/8" x 1-3/4" x 83-1/4" (1 x 4,5 x 211,5 cm) BEGIN Install gable end 83-1/4" corner trim under gable panel, (Fig. A) and flush to eave wall panel (Fig. B). Secure with 2" finishing nails spaced evenly. Install eave side 83-1/4"...
  • Page 71 10' x 12' COLLAR TIE PARTS REQUIRED: 3" (7,6 cm) 2 x 4 x 96" (5,1 x 10,2 x 243,9 cm) BEGIN Install collar tie TP to the 3rd rafter from the front with (3) 3" nails at each end. Flush to panel Flush to panel 3"...
  • Page 72 DOORS PARTS REQUIRED: 3" (7,6 cm) 1-1/4" (3,2 cm) 1 x 3 x 5" (2,5 x 7,6 x 12,7 cm) 69" (175,3 cm) Door Stiffener Left Door Right Door BEGIN Place doors on flat surface. 3/8" offset is to top. Look for red (right) and green (left) on hinge board.
  • Page 73 DOORS PARTS REQUIRED: 3" (7,6 cm) TEMPORARY SUPPORT 69" (175,3 cm) Door Stiffener Install OO flush under panels. Secure to floor frame with (2) 3" screws (Fig. A) . Mark center of door opening. Fig. A Flush against wall panels (2) 3"...
  • Page 74 DOORS PARTS REQUIRED: 2" (5,1 cm) 3/4" (1,9 cm) 19/32" x 2-1/2" x 26 5/8" (1,5 x 6,3 x 67,6 cm) 19/32" x 2-1/2" x 72" (1,5 x 7,6 x 182,9 cm) 19/32" x 2-1/2" x 39-7/8" (1,5 x 6,3 x 101,3 cm) 19/32"...
  • Page 75 DOOR STIFFENERS PARTS REQUIRED: 2" (5,1 cm) 69" (175,3 cm) Door Stiffener BEGIN Center OO vertically on the left door in the doorway (Fig. A) overlapping 1" (2,5 cm) along the edge of door (Fig. B). Secure with (7) 2" screws through outside trim into OO. Center OO vertically on the right door in the door opening offset 1"...
  • Page 76: Door Hardware

    DOOR HARDWARE PARTS REQUIRED: 5/16" (7,9 mm) Drill Bit 3/4" (1,9 cm) BEGIN Place bolt on OO in open position with bolt end 3/8" (9,5 mm) down from frame. Bolt is open when loop is contacting base (Fig A). Mark and pre-drill holes for screws. Install bolt with screws supplied. Drill 5/16"...
  • Page 77 DOOR HARDWARE PARTS REQUIRED: 1" (2,5 cm) 1-1/4" (3,2 cm) 1/2" (13 mm) Drill Bit 1/4" (6 mm) Drill Bit BEGIN Measure and mark location of hole on outside of right door as shown (Fig. A) . Pre-drill hole with 1/4" drill. Re-drill hole with 1/2"...
  • Page 78 HOOK & EYE PARTS REQUIRED: ¸ BEGIN Install hooks in wall and into framing behind (Fig.A). Fig. A Swing door open to locate eye. Hook Install hook into framing, if possible. FINISH You have installed your hook & eyes.
  • Page 79 VENT (Not included in kit.) • Follow directions provided by manufacturer and these instructions. 1/2" (13 mm) 16" x 8" BEGIN Locate and mark for two vents in side walls as shown; (1) at top and (1) at bottom. Cut out marked openings. Caulk behind vent flanges.
  • Page 80 PAINT & CAULK - NOT INCLUDED - • Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. • Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: •...
  • Page 81 SHINGLES - NOT INCLUDED - • Follow directions provided by manufacturer and these instructions. Familiarize yourself with a 3-Tab Shingle. Notch Notch SHINGLE NAIL PATTERN 1/2 " 1" Sealing Str 1" (1,3 cm) (2,5 cm) (2,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS.
  • Page 82 SHINGLES continued... Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. FRONT OF BACK OF SHED SHED Bend in roof 1" (2,5 cm) Notch Flush with rain slots.
  • Page 83 SHINGLES continued... After shingles are installed over bend, nail down overlap using two roofing nails per tab. (2) Nails per tab. Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below.
  • Page 84 SHINGLES - RIDGE CAP • You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles in THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5,1 cm) (5,1 cm) 2" 2" 2"...
  • Page 85 SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. 4" (10,2 cm) Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
  • Page 86 16941 10' x12' Order Form CATEGORY PART DESCRIPTION PART SIZE PART ITEM # BUILDING QTY. PART ID Loft Ledger Board "A" LUM SPF 2X3X96 #2&BTR 12115 2 X 3 Loft Ledger Board "B" 2 X 3 X 23 7/8" Q 23140000000 Back Wall Top &...
  • Page 87 Storage Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of assembly;...