babcockdavis BDC-1002 Installation, Operation And Maintenance Manual

Fire hose detention cabinet

Advertisement

Quick Links

Fire Hose Detention Cabinet
Model(s): BDC-1002/BDC-1052 /BDC-1302/BDC-1352
GENERAL DESCRIPTION
Introduction + Safety
Please read the complete instructions carefully before beginning any work. To ensure proper
installation and performance of the Roof Hatch, the following actions must be completed by
the installing contractor. Failure to do so will affect product warranty.
GENERAL SAFETY PRECAUTIONS
is solely the responsibility of the user, through its own analysis to select products suitable for their specific application
requirements, ensure they are properly maintained, and limit their use to its intended purpose. Follow proper local,
state and federal regulations for proper installation and operation requirements.
Transportation + Storage
o Inspect all shipments and materials for missing or damaged components and hardware.
o Material must be stored in a clean, dry location.
INSTALLATION
Non-Rated Extinguisher Cabinets
Non-Rated Extinguisher Cabinets can be installed in either metal or wood stud walls. All framing dimensions
must correspond with the dimensions indicated on our submittals.
1. Framing must be on all four (4) sides of the cabinet. Where load bearing studs are cut, a load bearing
header or frame out must be installed above the cabinet to maintain the load bearing integrity of the
wall.
Fire Hose Detention Cabinets are designed and
built for years of convenient and easy access to
mechanical areas in commercial buildings.
Improper selection, installation, or use can cause personal injury or property damage. It
Installation, Operation
+ Maintenance Manual
©2020 Babcock-Davis, Inc.
1
Rev/8/2020

Advertisement

loading

Summary of Contents for babcockdavis BDC-1002

  • Page 1 Installation, Operation + Maintenance Manual Fire Hose Detention Cabinet Model(s): BDC-1002/BDC-1052 /BDC-1302/BDC-1352 GENERAL DESCRIPTION Fire Hose Detention Cabinets are designed and built for years of convenient and easy access to mechanical areas in commercial buildings. Introduction + Safety Please read the complete instructions carefully before beginning any work. To ensure proper installation and performance of the Roof Hatch, the following actions must be completed by the installing contractor.
  • Page 2 Installation, Operation & Maintenance Fire Hose Detention Cabinet Model(s): BDC-1002/BDC-1052 /BDC-1302/BDC-1352 2. Position the cabinet in the wall, verifying that the backside of the cabinet frame is flush against the wall surface. 3. Drill pilot holes at least every 12” on each side of the cabinet through the tub wall and continue drilling through the studs.
  • Page 3 Installation, Operation & Maintenance Fire Hose Detention Cabinet Model(s): BDC-1002/BDC-1052 /BDC-1302/BDC-1352 OPERATION Fire Cabinets are designed and built for years of dependable wall access. MAINTENANCE o Fire Cabinet doors should be manually operated once a year to check performance. o Lubricate moving parts such as hinges and latches with a silicone spray lube as required to maintain a smooth opening and closing of the door.

This manual is also suitable for:

Bdc-1052Bdc-1302Bdc-1352Bdc-10Bdc-13Bdc-18