Summary of Contents for Shelfology Randle Monkey Bar
Page 1
Shelfology Certified Rad™ Made In The U.S.A. By Woodworkers, For Woodworkers_ Randle Monkey Bar Install Guide...
Page 2
Table of Contents Page Installation Steps Warnings Rad Tips Required Optional Tools Tools Drill Socket Stud Finder Measuring Wrench Tape ⁄ " Socket ⁄ " Level Diameter Drill Bit Pencil P.002...
Page 3
Randle brings your kid’s playroom to the next level with monkey bars literally anywhere. Cover your wall or ceiling with 30+ color choices of sheer fun. Monkeys not included. Made in-house by us in the United States of Awesome. Rad! What’s In What You’ll The Box...
Page 4
Installation Steps Before installation can begin, the install 16" OC location must be professionally inspected Spacing Between and prepared with structural support as Joists outlined in options 1A, 1B or 1C. Choose the option that best represents your structural situation and desired aesthetic. User safety is top priority.
Page 5
Once the structural support described in Step 1 has been established, hold the handle in desired location and mark the center of each mounting hole location with a pencil. A bubble level can be used during this step to ensure straightness. See Rad Tip ➀...
Page 6
Need a hand? Speak with a How did we do? You’ll get Shelf Geek at 949.244.1083 or an email soon asking for a hello@shelfology.com today. product review, and we’d be stoked if you oblige. You rock in advance! Warnings ➀...
Page 7
➀ ➁ Aligning Ceiling Height & Spacing Best Practices Multiple Monkey Bars 2 ⁄ " 12–14" 5' or 7' 2 ⁄ " 1.1 To align multiple 2.1 For children 2–5 monkey bars, draw years old, the monkey a vertical line along bar rungs should be a adequate studs or height of 5 feet or less...
Need help?
Do you have a question about the Randle Monkey Bar and is the answer not in the manual?
Questions and answers