Page 1
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net A Assembly instructions “Honeycomb Nest” Easy - Swing, part no. 4591-50- 3 Attention! Only use the assembly instruction included in the scope of delivery for the assembly, installation and maintenance of the respective equipment!
Table of content Assembly instructions “Honeycomb Nest” Easy - Swing, part no. 4591-50- 3 ...... 1 Introduction installation ......................... 4 Data sheet „Honeycomb Nest“ Easy- Swing, part no. 4591-50-3 ..........5 Scope of supply, parts list with part numbers ................8 Assembly instruction ........................13...
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Introduction installation 1.1 General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see tables 3-1 and 3-2).
50%. Assembly time once steel masts are embedded in concrete: Approximately 45 minutes. Number of persons required: 2 Any spare parts that may be required can be directly obtained by your supplier or Huck Seil- technik GmbH \\CAD1\Standard\4591-50-3\Montageanleitung\Easy_swing_Wabennest_4591_50_3_ST_B_L_09_GBR.doc...
Page 6
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Address: Huck Seiltechnik GmbH Dillerberg 3 D-35614 Aßlar/Berghausen Tel. 06443/8311-0 Fax. 06443/8311-79 We hereby confirm that this play equipment is tested and certified according to the new play- ing equipment norm EN 1176.
Page 7
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Drawings / views All optical illustrations simply demonstrate the propor- tions/dimensions to be followed, but are not binding, technical equipment images. Technical modifications supporting the advancement of our ar- ticles are subject to change.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Scope of supply, parts list with part numbers 3.1 in letters Table 3-1: Scope of supply, parts list with part numbers Element / Pos. Quantity Size O.K.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net 3.2 In symbols Table 3-2: Scope of supply, parts list with part numbers Pos. Quantity Symbol Ø 101,6 mm, 3,40 m long for Ø 101,6 mm Clamp fastening ground anchor for Ø...
Page 10
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Crescent bushing shakle M7 new shakle M8 straight 8s chain 8 members Concrete slabs 300 x 300 x 40 mm (by the customer) \\CAD1\Standard\4591-50-3\Montageanleitung\Easy_swing_Wabennest_4591_50_3_ST_B_L_09_GBR.doc...
Page 11
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Abbreviations and signs The legally prescribed setting times must be observed! Dimension between axes (centre-centre) post Clear post dimension Concrete C20/25 (B25) for foundation Top view / outline...
Page 12
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Thread locking! All screws, nuts and bushes (e.g. Torx-bushes) must be secured by Loctite! (stop screw nuts excepted \\CAD1\Standard\4591-50-3\Montageanleitung\Easy_swing_Wabennest_4591_50_3_ST_B_L_09_GBR.doc...
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Examination after installation If the equipment is not installed in a secure manner you must ensure that access is closed to the public! 5.1 Marking the filling level •...
Page 19
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net B Maintenance instruction “Honeycomb Nest” Easy - Swing, part no. 4591-50- 3 \\CAD1\Standard\4591-50-3\Montageanleitung\Easy_swing_Wabennest_4591_50_3_ST_B_L_09_GBR.doc...
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Introduction maintenance 6.1 General information This equipment should be installed, inspected, maintained and operated in ac- cordance with EN1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net General maintenance information 7.1 Maintenance intervals Maintenance intervals are based on average use. Please note that more fre- quent inspections and/or maintenance are required if the play equipment is subject to intensive use! 7.2 Inspection frequency...
Page 23
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net 7.10 Faults Damages must be repaired as soon as they are detected! If serious de- fects that affect the safety cannot be repaired straight away, the play- ground equipment must be closed to the public with immediate effect.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Maintenance timetable 8.1 Special advices 8.1.1 Maintenance interval We strongly advise to carry out inspections and maintenance work within the specified periods as use of the equipment, weather and malicious vandalism cause wear and tear that compromise safety and function of the equipment.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Monthly maintenance 10.1 Check the spaces between the equipment and the ground (clearance and height of fall). 10.2 Check the ground surface of fall protection for hard objects and loose foundations.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Annual main inspection 13.1 The complete equipment as well as the foundations and the surfaces are to be checked if they are generally safe. 13.2 The equipment is to be verified according to rotting and corrosion. For that some parts might have to be excavated.
HUCK Seiltechnik GmbH & Co. KG - Dillerberg 3 – 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Hand-over document After the installation of the equipment, the installation and maintenance documents are to be handed over to the operator. The operator has to have the documents signed. The complete filled and signed hand over...
Need help?
Do you have a question about the Honeycomb Nest and is the answer not in the manual?
Questions and answers