(2) Assemble the DPS(28ea).
(3) Assemble the DP and sheet.
* Make sure it is assembled on the sheet hangers
* There is chamfer in the lower left corner of the DP and sheet.
(4) Assemble the Panel and Guide Panel.
* Assemble the upper left/right first and assemble the bottom left/right.
- 27 -
Copyright ©
LG Electronics Inc. All rights reserved.
Only for training and service purposes.
D/P
Down