Craftsman C459-52414 Operator's Manual page 9

Two-stage snow throwers
Table of Contents

Advertisement

Figure 3-7
6.
Push the chute control rod toward the control panel until
the hole in the rod lines up with the middle hole in the
chute control input and insert the cotter pin. See Figure
3-8.
NOTE: There is a reference hole provided at rear end of
control rod to help know when holes are vertical.
Figure 3-8
NOTE: The hole furthest from the chute control assembly
is used to achieve further engagement of the chute control
rod into the coupler if required. Refer to the Maintenance &
Adjustments section for Chute Control Rod adjustment.
The hole closest to the chute control assembly is used for
manual movement of the chute assembly if required. Refer
to the Controls & Features section.
7.
Check that the cables are properly routed through the
cable guide on top of the engine. See Figure 3-9.
NOTE: For smoothest operation, the cables should all be to
the left of the chute directional control rod.
Figure 3-9
Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower. Store them in your snow
thrower's dash panel until needed. See Figure 3-10.
Figure 3-10
S
ection
3 — A
& S
-U
SSembly
et
p
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C459-52416C459-52447

Table of Contents